Field Guides & Best Practices
Version 2.1 by Sima Mousavi on 2024/01/16 12:34
Seismic Station Setup
Conducting field work for a seismic station setup involves a series of meticulous steps and considerations to ensure accurate and reliable seismic data collection.
Long term solar powered stations
Site selection and preparation
- Choose a location with minimal noise interference and away from urban areas, traffic, and industrial activities.
- The site should be geologically stable and representative of the area's seismic characteristics.
- Accessibility and security of the site are also important factors.
- Conduct a detailed survey of the site, including topographical, geological, and geophysical assessments.
- Prepare the site by clearing vegetation, leveling the ground
Installing Seismic Sensors
xyz
Sub-sub paragraph
xyz
Node Setup
Short term (~30 day) battery powered nodes
Sub-paragraph
abc
Sub-paragraph
abc
Contents
Figure 1: Typical station setup (LPR-200 & 10w solar panel)
Figure 2: Flipping up the back of the fence onto the support picket to work comfortably