Changes for page Field Deployment Guides
Last modified by KB on 2025/08/12 12:18
From version 2.1
edited by Sima Mousavi
on 2024/01/16 12:34
on 2024/01/16 12:34
Change comment:
There is no comment for this version
To version 4.2
edited by Sima Mousavi
on 2024/01/16 13:23
on 2024/01/16 13:23
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
-
Attachments (0 modified, 1 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -1,7 +1,5 @@ 1 - 1 += **Seismic Station Setup** = 2 2 3 -= Seismic Station Setup = 4 - 5 5 Conducting field work for a seismic station setup involves a series of meticulous steps and considerations to ensure accurate and reliable seismic data collection. 6 6 \\Long term solar powered stations 7 7 ... ... @@ -11,21 +11,35 @@ 11 11 ((( 12 12 == **Site selection and preparation** == 13 13 14 -* Choose a location with minimal noise interference and away from urban areas, traffic, and industrial activities. 12 +* ((( 13 +Choose a location with minimal noise interference and away from urban areas, traffic, and industrial activities. 14 +))) 15 15 * The site should be geologically stable and representative of the area's seismic characteristics. 16 16 * Accessibility and security of the site are also important factors. 17 17 * Conduct a detailed survey of the site, including topographical, geological, and geophysical assessments. 18 18 * Prepare the site by clearing vegetation, leveling the ground 19 19 20 -== **Installing SeismicSensors** ==20 +== **Installing seismic sensors** == 21 21 22 -xyz 22 +* Bury seismometers at an appropriate depth for noise reduction and stable ground coupling. 23 +* Orient the sensors correctly using a compass, paying special attention to the north direction. When using a compass to orient the sensors, ensure it is kept away from metal objects or structures that could interfere with its magnetic field. Accurately determine the north direction for precise sensor orientation. 23 23 24 -== =Sub-subparagraph===25 +== **Setting up data**: == 25 25 26 -xyz 27 +* Install data loggers or recorders compatible with the sensors. 28 +* Ensure adequate storage capacity and configuration for the desired sampling rate and data format. 29 +* Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the south hemisphere for optimal sunlight exposure. 30 +* Calibrate sensors and data acquisition systems for accuracy. 31 +* Test for sensitivity, noise levels, and overall performance. 27 27 33 +== **Fire safety measures and documentation in seismic station installation** == 28 28 35 +* In bushfire-prone areas, clear a wide perimeter around the installation to reduce fire risk. 36 +* Use fireproof blankets to cover equipment, providing an additional layer of protection against fire damage. 37 + 38 +* Document the installation process, including sensor types, orientations, locations, and system configurations, along with fire safety measures implemented. 39 +* Record essential metadata for seismic data interpretation. 40 + 29 29 = Node Setup = 30 30 31 31 Short term (~~30 day) battery powered nodes ... ... @@ -52,3 +52,8 @@ 52 52 //Figure 2: Flipping up the back of the fence onto the support picket to work comfortably// 53 53 ))) 54 54 ))) 67 + 68 +[[**Fireproof blanket** 69 +size: 1x1 m2>>image:20240116_125547.jpg||alt="Fire blanket" height="380" width="350"]] 70 + 71 +
- 20240116_125547.jpg
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.sima - Size
-
... ... @@ -1,0 +1,1 @@ 1 +340.5 KB - Content