3 3  = Seismic Station Setup =
4 4  
5 -Long term solar powered stations
5 +Conducting field work for a seismic station setup involves a series of meticulous steps and considerations to ensure accurate and reliable seismic data collection. 
6 +\\Long term solar powered stations
6 6  
7 7  (% class="row" %)
8 8  (((
9 9  (% class="col-xs-12 col-sm-8" %)
10 10  (((
11 -== Sub-paragraph ==
12 +== **Site selection and preparation** ==
12 12  
13 -xyz
14 +* Choose a location with minimal noise interference and away from urban areas, traffic, and industrial activities.
15 +* The site should be geologically stable and representative of the area's seismic characteristics.
16 +* Accessibility and security of the site are also important factors.
17 +* Conduct a detailed survey of the site, including topographical, geological, and geophysical assessments.
18 +* Prepare the site by clearing vegetation, leveling the ground
14 14  
15 -== Sub-paragraph ==
20 +== **Installing Seismic Sensors** ==
16 16  
17 17  xyz
18 18