Last modified by robert on 2025/10/29 10:39

From version 85.1
edited by Jack Dent
on 2025/09/29 12:55
Change comment: There is no comment for this version
To version 81.1
edited by Jack Dent
on 2025/08/01 16:19
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -16,8 +16,6 @@
16 16  
17 17  = **Programming Defaults** =
18 18  
19 -SmartSolo provides the following powerpoint for SmartSolo node programming and operation. Note that ANSIR only uses a portion of their process for our own uses: [[https:~~/~~/nappe.wustl.edu/smartsolo/files/smartsolo_online_training.pdf>>https://nappe.wustl.edu/smartsolo/files/smartsolo_online_training.pdf]]
20 -
21 21  The nodes must be programmed in the SoloLite software prior to use. Screenshots for the short period 16HR-3C and broadband BDC3-5 are shown with our recommended parameters.
22 22  
23 23  [[IGU-16 3C (short period node) programming screen set at 250 Hz. Ensure that the highlighted areas are set!>>image:SP_programming.labels.png||alt="IGU-16 3C programming screen"]]
... ... @@ -46,18 +46,6 @@
46 46  **Note that any applied instrument gain must be removed when exporting (e.g. to miniseed) after your deploy, **otherwise amplitudes will be a factor of either 15.84893192 (24db) or 2 (6db) too high!
47 47  {{/info}}
48 48  
49 -=== **Programming tips**: ===
50 -
51 -Connecting SmartSolo nodes to their harvesters and having SoloLite recognise them can be a bit tricky, here are some tricks to help register and program them easier:
52 -
53 - - Place the node on the harvester gently, then firmly press it down onto the pins
54 -
55 - - Place all nodes onto the harvester before trying any troubleshooting, as they may not show up while the SoloLite software is running. Once all are connected, try  restarting the software for them to be recognised.
56 -
57 - - If a node is refusing to connect, try it with another slot. It is easiest if you place all 16 nodes on the harvester, and swap any nodes that refuse to connect with eachother
58 -
59 - - Nodes will likely not show up in the order that they should, though this is not an issue. Eg, a node in slot 6 on the harvester may show up in port 13 in the SoloLite software
60 -
61 61  = **Fieldwork Preparation** =
62 62  
63 63  (% class="box warningmessage" %)
... ... @@ -294,10 +294,6 @@
294 294  )))
295 295  )))
296 296  
297 -== Smart Solo Z Polarity bug ==
298 -
299 -See [[https:~~/~~/auspass.edu.au/xwiki/bin/view/Data/AusPass%20Data/#HSmartSoloNodeZPolaritybug>>https://auspass.edu.au/xwiki/bin/view/Data/AusPass%20Data/#HSmartSoloNodeZPolaritybug]] for discussion. If data is headed to AusPass, we prefer to invert the IGU-16HR 3 Z channel data manually rather than invert the response metadata. The BD3C-5 data does not require a polarity inversion.
300 -
301 301  == Handling Nodes During Download ==
302 302  
303 303  1. (((