Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/07/16 16:40
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -21,6 +21,8 @@ 21 21 22 22 = **Fieldwork Preparation** = 23 23 24 +(% class="box infomessage" %) 25 +((( 24 24 (% class="box warningmessage" %) 25 25 ((( 26 26 **INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING** ... ... @@ -29,6 +29,7 @@ 29 29 30 30 **We have had good experience with the 4Tb Samsung T7 Shield drives.** 31 31 ))) 34 +))) 32 32 33 33 == Magnets == 34 34 ... ... @@ -40,22 +40,17 @@ 40 40 41 41 = **Installation** = 42 42 43 -(% class="box infomessage" %) 44 -((( 45 -**Field logs are a critical component of fieldwork and this is especially the case for large N nodal deploys. Take notes!** 46 -))) 47 - 48 48 == 1. Logbook documentation ~*~** TODO ADD LOGBOOK FORMS == 49 49 50 50 ((( 51 -**Essential Details** forfieldlogs:49 +**Essential Details**: Record the following in a logbook: 52 52 53 53 * Station name 54 -* Latitude ,longitude, elevation52 +* Latitude and longitude 55 55 * Names of team members present 56 -* Date and bothlocal& UTCtime of installation/removal57 -* Serial number (SN) of the TOP HALF of thesensor(if a BD3C-5, there is only one serial number)58 -* Detailed notes on the site conditions and setup , anything else that will be helpful to find it again ("by the fence", "south of rock", etc)54 +* Date and local time of installation 55 +* Serial number (SN) of the sensor 56 +* Detailed notes on the site conditions and setup 59 59 60 60 == 2. Node Placement == 61 61 ))) ... ... @@ -65,8 +65,8 @@ 65 65 **Site Analysis**: 66 66 67 67 * **Take compass measurements away from the sensor as it will affect your measurement.** 68 -* Take photographs from various angles to document the site setup thoroughly. 69 -* Include a detailed site description in your notes 66 +* Take multiple photographs from various angles to document the site setup thoroughly. 67 +* Include a detailed site description in your notes, specifying distances and orientations from nearby landmarks (e.g. Richards garden, Te Mini steam field eastern side) 70 70 71 71 == 3. GPS Considerations == 72 72