... ... @@ -307,8 +307,11 @@
307 307  
308 308  **Procedure for Seismic Nodes:**
309 309  
310 -* If the nodes are placed in a sturdy plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us!
310 +Top half:
311 311  
312 +Bottom half: The metal spikes on the bottom half of the nodes can be cleaned using a wire brush, though should still be wiped down for dust afterwards.
313 +
314 +
312 312  = **Weights (for shipping)** =
313 313  
314 314  The weights of bags of nodes, as well as data harvesters and node chargers, are listed below: