Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/06/16 07:51
From version 49.2
edited by Kimberley Berends
on 2024/05/29 15:05
on 2024/05/29 15:05
Change comment:
There is no comment for this version
Summary
-
Page properties (3 modified, 0 added, 0 removed)
Details
- Page properties
-
- Title
-
... ... @@ -1,1 +1,1 @@ 1 -SmartSolo Nodes 1 +SmartSolo Node Seismometers - Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. KB1 +XWiki.robert - Content
-
... ... @@ -104,16 +104,8 @@ 104 104 105 105 == **7. Additional Best Practices** == 106 106 107 -* **Environmental Responsibility**: Ensure that the node placement and the materials used are environmentally responsible and adhere to local regulations. 108 108 * **Training and Familiarisation**: Make sure all team members are adequately trained in using the GPS devices, compass use, and other equipment to ensure consistent and accurate data collection. 109 109 110 -* ((( 111 -==== **Keeping the Instruments Clean** ==== 112 -))) 113 -* ((( 114 -Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness. 115 -))) 116 - 117 117 ---- 118 118 119 119 = **Seismic Station Demobilization and Documentation** = ... ... @@ -245,7 +245,7 @@ 245 245 ((( 246 246 * **Ensure to export data as "COUNTS", not "mV".** 247 247 248 -* **Set "Remove Gain" to the same decibel gain as during programming** **(by default ANU sets this to 24db (a factor of 15.848932).** 240 +* **Set "Remove Gain" to the same decibel gain as during programming** **(by default ANU sets this to 24db for short period nodes (a factor of 15.848932), and 6db for broadband nodes).** 249 249 ))) 250 250 ))) 251 251 ... ... @@ -307,8 +307,11 @@ 307 307 308 308 **Procedure for Seismic Nodes:** 309 309 310 - * If the nodes areplacedin a sturdy plastic bag at the time of installation, the cleaning procedure should be straightforward.If not you have a lot of work to do before they are returned to us!302 +Top half: 311 311 304 +Bottom half: The metal spikes on the bottom half of the nodes can be cleaned using a wire brush, though should still be wiped down for dust afterwards. 305 + 306 + 312 312 = **Weights (for shipping)** = 313 313 314 314 The weights of bags of nodes, as well as data harvesters and node chargers, are listed below: ... ... @@ -348,8 +348,12 @@ 348 348 |(% style="width:189px" %)**Size (without spike)**|(% style="width:221px" %)158 x160mm 349 349 |(% style="width:189px" %)**Weight**|(% style="width:221px" %)2.8 kg 350 350 |(% style="width:189px" %)**Data Storage**|(% style="width:221px" %)64 Gb 351 -|(% style="width:189px" %)**Battery**|(% style="width:221px" %)Li_etc XXAh 346 +|(% style="width:189px" %)**Battery**|(% style="width:221px" %)((( 347 +Lithium-ion battery contained in equipment (168.84 Wh) 348 + 349 +UN3481 PI967 S1 352 352 ))) 351 +))) 353 353 354 354 (% class="box" %) 355 355 ((( ... ... @@ -365,7 +365,7 @@ 365 365 |(% style="width:187px" %)**Weight**|(% style="width:224px" %)2.4 kg 366 366 |(% style="width:187px" %)**Data Storage**|(% style="width:224px" %)64 Gb 367 367 |(% style="width:187px" %)**Battery**|(% style="width:224px" %)((( 368 -Lithium-ion (96.48 Wh) 367 +Lithium-ion battery contained in equipment (96.48 Wh) 369 369 370 370 UN3481 PI967 S2 371 371 )))