Last modified by robert on 2025/06/16 07:51

From version 47.1
edited by robert
on 2024/05/17 16:37
Change comment: There is no comment for this version
To version 55.1
edited by Kimberley
on 2025/05/26 13:10
Change comment: There is no comment for this version

Summary

Details

Page properties
Title
... ... @@ -1,1 +1,1 @@
1 -SmartSolo Nodes
1 +SmartSolo Seismometers
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.robert
1 +XWiki.Kimberley
Content
... ... @@ -104,16 +104,8 @@
104 104  
105 105  == **7. Additional Best Practices** ==
106 106  
107 -* **Environmental Responsibility**: Ensure that the node placement and the materials used are environmentally responsible and adhere to local regulations.
108 108  * **Training and Familiarisation**: Make sure all team members are adequately trained in using the GPS devices, compass use, and other equipment to ensure consistent and accurate data collection.
109 109  
110 -* (((
111 -==== **Keeping the Instruments Clean** ====
112 -)))
113 -* (((
114 -Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness.
115 -)))
116 -
117 117  ----
118 118  
119 119  = **Seismic Station Demobilization and Documentation** =
... ... @@ -245,7 +245,7 @@
245 245  (((
246 246  * **Ensure to export data as "COUNTS", not "mV".**
247 247  
248 -* **Set "Remove Gain" to the same decibel gain as during programming** **(by default ANU sets this to 24db (a factor of 15.848932).**
240 +* **Set "Remove Gain" to the same decibel gain as during programming** **(by default ANU sets this to 24db for short period nodes (a factor of 15.848932), and 6db for broadband nodes).**
249 249  )))
250 250  )))
251 251  
... ... @@ -307,7 +307,24 @@
307 307  
308 308  **Procedure for Seismic Nodes:**
309 309  
310 -* If the nodes are placed in a sturdy plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us!
302 +Top half:
303 +
304 +Bottom half: The metal spikes on the bottom half of the nodes can be cleaned using a wire brush, though should still be wiped down for dust afterwards.
305 +
306 +
307 += **Weights (for shipping)** =
308 +
309 +The weights of bags of nodes, as well as data harvesters and node chargers, are listed below:
310 +
311 +1 bag + 6 SP (IGU-16HR) nodes: 18 kg
312 +
313 +1 SP (IGU-16HR) data harvester: 21.5 kg
314 +
315 +1 SP (IGU-16HR) charger: 26.3 kg
316 +
317 +1 BB (BD3C-5) charger/data harvester (with and without 16 cables): 21 kg / 14.5 kg
318 +
319 +1 case + 5 BB (BD3C-5) nodes and 6 BB nodes: 22 kg / 25 kg
311 311  )))
312 312  
313 313  (% class="col-xs-12 col-sm-4" %)
... ... @@ -334,8 +334,12 @@
334 334  |(% style="width:189px" %)**Size (without spike)**|(% style="width:221px" %)158 x160mm
335 335  |(% style="width:189px" %)**Weight**|(% style="width:221px" %)2.8 kg
336 336  |(% style="width:189px" %)**Data Storage**|(% style="width:221px" %)64 Gb
337 -|(% style="width:189px" %)**Battery**|(% style="width:221px" %)Li_etc XXAh
346 +|(% style="width:189px" %)**Battery**|(% style="width:221px" %)(((
347 +Lithium-ion battery contained in equipment (168.84 Wh)
348 +
349 +UN3481 PI967 S1
338 338  )))
351 +)))
339 339  
340 340  (% class="box" %)
341 341  (((
... ... @@ -350,8 +350,12 @@
350 350  |(% style="width:187px" %)**Size (with spike)**|(% style="width:224px" %)103mm(L) × 95mm(W) × 187mm
351 351  |(% style="width:187px" %)**Weight**|(% style="width:224px" %)2.4 kg
352 352  |(% style="width:187px" %)**Data Storage**|(% style="width:224px" %)64 Gb
353 -|(% style="width:187px" %)**Battery**|(% style="width:224px" %)Lithium ion XXAh
366 +|(% style="width:187px" %)**Battery**|(% style="width:224px" %)(((
367 +Lithium-ion battery contained in equipment (96.48 Wh)
368 +
369 +UN3481 PI967 S2
354 354  )))
371 +)))
355 355  
356 356  
357 357  )))