Last modified by robert on 2025/06/16 07:51

From version 45.3
edited by robert
on 2024/05/15 09:51
Change comment: There is no comment for this version
To version 43.2
edited by robert
on 2024/05/14 18:36
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -33,7 +33,7 @@
33 33  
34 34  = **Installation** =
35 35  
36 -== **1- Logbook documentation** ==
36 +=== **1- Logbook documentation** ===
37 37  
38 38  (((
39 39  **Essential Details**: Record the following in a logbook:
... ... @@ -45,7 +45,7 @@
45 45  * Serial number (SN) of the sensor
46 46  * Detailed notes on the site conditions and setup
47 47  
48 -== **2- Node Placement** ==
48 +=== **2- Node Placement** ===
49 49  )))
50 50  
51 51  **Protection**: Place nodes inside (landfill) biodegradable bags to minimize cleaning and cross-site soil contamination.
... ... @@ -56,12 +56,12 @@
56 56  * Take multiple photographs from various angles to document the site setup thoroughly.
57 57  * Include a detailed site description in your notes, specifying distances and orientations from nearby landmarks (e.g. Richards garden, Te Mini steam field eastern side)
58 58  
59 -== **3- GPS Considerations** ==
59 +=== **3- GPS Considerations** ===
60 60  
61 61  (% class="wikigeneratedid" %)
62 62  The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. **These nodes will not start recording without attaining a GPS lock** and repeated attempts will excessively drain the battery.
63 63  
64 -== **4- Visibility and Location Marking** ==
64 +=== **4- Visibility and Location Marking** ===
65 65  
66 66  **Flag Placement**: Position a flag, preferably in a bright color (avoid green or yellow), near the instrument to aid in its future location.
67 67  
... ... @@ -70,7 +70,7 @@
70 70  * Use a GPS device to mark the instrument's exact location.
71 71  * Record this location in both your paper notes and the GPS device.
72 72  
73 -== (% style="color:inherit; font-family:inherit; font-size:max(18px, min(20px, 14.4444px + 0.462963vw))" %)**5- Charge Time, Pre-Deployment & Post-Deployment**(%%) ==
73 +=== (% style="color:inherit; font-family:inherit; font-size:max(18px, min(20px, 14.4444px + 0.462963vw))" %)**5- Charge Time, Pre-Deployment & Post-Deployment**(%%) ===
74 74  
75 75  * **Charging Duration**: Both types of nodes take approximately 6-8 hours to fully charge from a flat state.
76 76  * **Pre-Deployment Charging**:
... ... @@ -87,7 +87,7 @@
87 87  ** Nodes should not be stored fully charged, and it **they should especially not be stored with 0 charge.**
88 88  
89 89  (((
90 -== **6- Data Sharing and Metadata Creation** ==
90 +=== **6- Data Sharing and Metadata Creation** ===
91 91  )))
92 92  
93 93  **GPS Data**:
... ... @@ -102,7 +102,7 @@
102 102  
103 103  * Create and organize metadata via the ANU metadata standard (~*~*add example)
104 104  
105 -== **7- Additional Best Practices** ==
105 +=== **7- Additional Best Practices** ===
106 106  
107 107  * **Environmental Responsibility**: Ensure that the node placement and the materials used are environmentally responsible and adhere to local regulations.
108 108  * **Training and Familiarisation**: Make sure all team members are adequately trained in using the GPS devices, compass use, and other equipment to ensure consistent and accurate data collection.
... ... @@ -164,34 +164,30 @@
164 164  
165 165  = **Charging Procedure for Seismic Nodes** =
166 166  
167 -(((
168 -== **1. Preparation for Charging**: ==
167 +1. (((
168 +=== **Preparation for Charging**: ===
169 169  
170 170  * Before charging, ensure each node is clean. This involves removing any dirt or debris to maintain the integrity of the equipment and ensure effective charging.
171 171  )))
172 +1. (((
173 +=== **Disassembling the Node**: ===
172 172  
173 -(((
174 -== **2. Disassembling the Node**: ==
175 -
176 176  * For the IGU-16HR, remove the battery (bottom half) from the sensor. This is done by unscrewing the spikes counter-clockwise.
177 177  )))
177 +1. (((
178 +=== **Setting Nodes in the Charging Box**: ===
178 178  
179 -(((
180 -== **3. Setting Nodes in the Charging Box**: ==
181 -
182 182  * Place 1-16 IGU-16HR battery components upside-down into the charger, assuring they are oriented properly.
183 183  )))
182 +1. (((
183 +=== **Monitoring the Charging Process**: ===
184 184  
185 -(((
186 -== **4. Monitoring the Charging Process**: ==
187 -
188 188  * Once the nodes are set in the charging box and the charging process begins, lights adjacent to the batteries will illuminate. These lights indicate that charging is underway.
189 189  * Observe the transition of the lights from steady red to orange, then to green, and finally to flashing green. A flashing green light signifies that the batteries are fully charged. For storage, the goal is to charge them to ORANGE.
190 190  )))
188 +1. (((
189 +=== **Updating Charge Status**: ===
191 191  
192 -(((
193 -== **5. Updating Charge Status**: ==
194 -
195 195  * During the charging period, take this opportunity to update the status of each unit. Check the //"C"// box on your temporary labels to indicate that the unit has been successfully charged.
196 196  * This step is crucial for tracking the charging status of multiple units, especially when handling a large number of nodes.
197 197  )))
... ... @@ -205,9 +205,9 @@
205 205  
206 206  ----
207 207  
208 -= **Downloading and Converting Seismic Data to MiniSeed Format** =
204 +=== **Downloading and Converting Seismic Data to MiniSeed Format** ===
209 209  
210 -== **Node Registration and Software Setup** ==
206 +==== **Node Registration and Software Setup** ====
211 211  
212 212  1. (((
213 213  **Registering Nodes in the System**:
... ... @@ -225,7 +225,7 @@
225 225  * Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script.
226 226  )))
227 227  
228 -== **Data Downloading Process** ==
224 +==== **Data Downloading Process** ====
229 229  
230 230  1. (((
231 231  **Initiating Data Download**:
... ... @@ -249,7 +249,7 @@
249 249  )))
250 250  )))
251 251  
252 -== **Handling Nodes During Download** ==
248 +==== **Handling Nodes During Download** ====
253 253  
254 254  1. (((
255 255  **Monitoring Download Indicators**:
... ... @@ -307,7 +307,9 @@
307 307  
308 308  **Procedure for Seismic Nodes:**
309 309  
310 -* If the nodes are placed in a sturdy plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us!
306 +* If the nodes are placed in a thick plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us!
307 +
308 += =
311 311  )))
312 312  
313 313  (% class="col-xs-12 col-sm-4" %)
... ... @@ -316,11 +316,10 @@
316 316  (((
317 317  **Contents**
318 318  
319 -{{toc/}}
320 -
321 321  
322 322  )))
323 323  
320 +
324 324  (% class="box" %)
325 325  (((
326 326  = SmartSolo [[BD3C-5>>url:https://smartsolo.com/cp-4.html]] =