Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/06/16 07:51
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -33,7 +33,7 @@ 33 33 34 34 = **Installation** = 35 35 36 -== **1 -Logbook documentation** ==36 +== **1. Logbook documentation** == 37 37 38 38 ((( 39 39 **Essential Details**: Record the following in a logbook: ... ... @@ -45,7 +45,7 @@ 45 45 * Serial number (SN) of the sensor 46 46 * Detailed notes on the site conditions and setup 47 47 48 -== **2 -Node Placement** ==48 +== **2. Node Placement** == 49 49 ))) 50 50 51 51 **Protection**: Place nodes inside (landfill) biodegradable bags to minimize cleaning and cross-site soil contamination. ... ... @@ -56,12 +56,12 @@ 56 56 * Take multiple photographs from various angles to document the site setup thoroughly. 57 57 * Include a detailed site description in your notes, specifying distances and orientations from nearby landmarks (e.g. Richards garden, Te Mini steam field eastern side) 58 58 59 -== **3 -GPS Considerations** ==59 +== **3. GPS Considerations** == 60 60 61 61 (% class="wikigeneratedid" %) 62 62 The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. **These nodes will not start recording without attaining a GPS lock** and repeated attempts will excessively drain the battery. 63 63 64 -== **4 -Visibility and Location Marking** ==64 +== **4. Visibility and Location Marking** == 65 65 66 66 **Flag Placement**: Position a flag, preferably in a bright color (avoid green or yellow), near the instrument to aid in its future location. 67 67 ... ... @@ -70,7 +70,7 @@ 70 70 * Use a GPS device to mark the instrument's exact location. 71 71 * Record this location in both your paper notes and the GPS device. 72 72 73 -== (% style="color:inherit; font-family:inherit; font-size:max(18px, min(20px, 14.4444px + 0.462963vw))" %)**5 -Charge Time, Pre-Deployment & Post-Deployment**(%%) ==73 +== (% style="color:inherit; font-family:inherit; font-size:max(18px, min(20px, 14.4444px + 0.462963vw))" %)**5. Charge Time, Pre-Deployment & Post-Deployment**(%%) == 74 74 75 75 * **Charging Duration**: Both types of nodes take approximately 6-8 hours to fully charge from a flat state. 76 76 * **Pre-Deployment Charging**: ... ... @@ -205,9 +205,9 @@ 205 205 206 206 ---- 207 207 208 -= ==**Downloading and Converting Seismic Data to MiniSeed Format** ===208 += **Downloading and Converting Seismic Data to MiniSeed Format** = 209 209 210 -== ==**Node Registration and Software Setup** ====210 +== **Node Registration and Software Setup** == 211 211 212 212 1. ((( 213 213 **Registering Nodes in the System**: ... ... @@ -225,7 +225,7 @@ 225 225 * Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script. 226 226 ))) 227 227 228 -== ==**Data Downloading Process** ====228 +== **Data Downloading Process** == 229 229 230 230 1. ((( 231 231 **Initiating Data Download**: ... ... @@ -249,7 +249,7 @@ 249 249 ))) 250 250 ))) 251 251 252 -== ==**Handling Nodes During Download** ====252 +== **Handling Nodes During Download** == 253 253 254 254 1. ((( 255 255 **Monitoring Download Indicators**: ... ... @@ -303,7 +303,7 @@ 303 303 304 304 ---- 305 305 306 -= ==**Cleaning** ===306 += **Cleaning** = 307 307 308 308 **Procedure for Seismic Nodes:** 309 309