... ... @@ -4,273 +4,32 @@
4 4  (((
5 5  = **Node Setup** =
6 6  
7 -Short term (~~30 day) battery powered nodes. The default gain should be 24 db for the 16HR-3C and 6 db for the BD3C-5
7 +Short term (~~30 day) battery powered nodes
8 8  
9 -
10 -~*~**this needs to be reformatted
11 -
12 12  == **Pre-Fieldwork Preparation** ==
13 13  
14 -(% class="box infomessage" %)
11 +>(% class="box infomessage" %)
15 15  (((
16 -(% class="box warningmessage" %)
17 -(((
18 -**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING**
19 -
20 -**Plan on 1 Tb to store ALL data for 50 nodes @ 250 Hz and a single ~~30 day occupation**
13 +**~ INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING **
21 21  )))
22 -)))
23 23  
24 -= **Installation** =
16 +== **Installation** ==
25 25  
26 -=== **1- Logbook documentation** ===
27 -
28 -(((
29 -**Essential Details**: Record the following in a logbook:
30 -
31 -* Station name
32 -* Latitude and longitude
33 -* Names of team members present
34 -* Date and local time of installation
35 -* Serial number (SN) of the sensor
36 -* Detailed notes on the site conditions and setup
37 -
38 -=== **2- Node Placement** ===
39 -)))
40 -
41 -**Protection**: Place nodes inside thick, landfill biodegradable plastic bags for environmental protection.
42 -
43 -**Site Analysis**:
44 -
45 -* Conduct compass measurements away from the node and metallic structures, adjusting for inclination angle.
46 -* Take multiple photographs from various angles to document the site setup thoroughly.
47 -* Include a detailed site description in your notes, specifying distances and orientations from nearby landmarks (e.g. Richards garden, Te Mini steam field eastern side)
48 -
49 -=== **3- GPS Considerations** ===
50 -
51 -(% class="wikigeneratedid" %)
52 -The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. The BD3C will not start recording without first attaining a GPS lock.
53 -
54 -=== **4- Visibility and Location Marking** ===
55 -
56 -**Flag Placement**: Position a flag, preferably in a bright color (avoid green or yellow), near the instrument to aid in its future location.
57 -
58 -**GPS Marking**:
59 -
60 -* Use a GPS device to mark the instrument's exact location.
61 -* Record this location in both your paper notes and the GPS device.
62 -
63 -=== (% style="color:inherit; font-family:inherit; font-size:max(18px, min(20px, 14.4444px + 0.462963vw))" %)**5- Charge Time, Pre-Deployment & Post-Deployment**(%%) ===
64 -
65 -* **Charging Duration**: Both types of nodes take approximately 6-8 hours to fully charge from a flat state.
66 -* **Pre-Deployment Charging**:
67 -** Although the nodes hold their charge well, it's beneficial to give them a "top up" charge right before deployment.
68 -
69 -* **Operational Duration**:
70 -** When recording at 250 Hz, with GPS on and Bluetooth disabled, the instruments are expected to last about 30 days per charge cycle.
71 -
72 -* **Post-Retrieval Charging**:
73 -** Do not store the instruments with completely drained batteries.
74 -** After retrieval, charge the instruments to about 50-60% (indicated as "orange" level) for optimal battery health.
75 -
76 -* **Storage and Shipping Charge Level**:
77 -** Maintain a battery charge level of around 50-60% for both storage and shipping purposes.
78 -** This charge level is recommended to prevent battery damage and is safe for transportation.
79 -
80 -=== ===
81 -
82 82  * (((
83 -=== **6- Data Sharing and Metadata Creation** ===
84 -)))
19 +**Logbook Maintenance**: Document essential details:
85 85  
86 -**GPS Data**:
87 -
88 -* Download the GPS file to a laptop.
89 -* Share this file on a drive accessible to all team members for uniform understanding of node locations.
90 -
91 -**Photo Sharing**:
92 -
93 -* Upload site photos to a shared platform (OneDrive, Dropbox, etc.).
94 -* Integrating photos into Google Maps or Google Earth can be particularly beneficial for easy location referencing.
95 -
96 -**Metadata File**:
97 -
98 -* Create a metadata XML file for each node, which is essential for data organisation and future reference.
99 -
100 -=== **7- Additional Best Practices** ===
101 -
102 -* **Environmental Responsibility**: Ensure that the node placement and the materials used are environmentally responsible and adhere to local regulations.
103 -* **Training and Familiarisation**: Make sure all team members are adequately trained in using the GPS devices, compass, and other equipment to ensure consistent and accurate data collection.
104 -
105 -* (((
106 -==== **Keeping the Instruments Clean** ====
21 +* Station name, latitude/longitude, team members, date/time.
22 +* Serial number (SN) of sensor, site notes.
107 107  )))
108 -* (((
109 -Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness.
110 -)))
24 +* **Node Placement**: Use biodegradable plastic bags for node protection.
25 +* **Orientation and Site Description**:
26 +** Compass measurements (adjust for inclination).
27 +** Detailed description of the site, including landmarks.
28 +* **Visibility and GPS Marking**:
29 +** Use distinctively colored flags for easy location.
30 +** Mark location with GPS; record in logbook and device.
31 +* **Photo Documentation**: Take multiple photos from various angles.
111 111  
112 -----
113 -
114 -=== **Seismic Station Demobilization and Documentation** ===
115 -
116 -1. (((
117 -**Preparation for Demobilization**:
118 -
119 -* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag.
120 -)))
121 -1. (((
122 -**Locating the instrument**:
123 -
124 -* Use the downloaded GPS file to accurately locate the node for demobilization.
125 -* Import this KMZ file onto your phone for easy reference and location tracking.
126 -* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location.
127 -)))
128 -1. (((
129 -**Labeling Instruments for Demobilization**:
130 -
131 -* Write the station name and the instrument’s serial number on a label.
132 -* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label.
133 -* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data.
134 -)))
135 -1. (((
136 -**Photographing the Setup Node**:
137 -
138 -* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__.
139 -* This photo serves as a final record of the instrument’s condition and orientation at the time of removal.
140 -)))
141 -1. (((
142 -**Logging Demobilization Details**:
143 -
144 -* Use the field logbook to note the time of demobilization, serial numbers, and station name.
145 -* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors.
146 -)))
147 -1. (((
148 -**Final Checks and Equipment Removal**:
149 -
150 -* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken.
151 -* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport.
152 -)))
153 -
154 -----
155 -
156 -=== **Charging Procedure for Seismic Nodes** ===
157 -
158 -1. (((
159 -**Preparation for Charging**:
160 -
161 -* Before charging, ensure each node is clean. This involves removing any dirt or debris to maintain the integrity of the equipment and ensure effective charging.
162 -)))
163 -1. (((
164 -**Disassembling the Node**:
165 -
166 -* Carefully remove the battery and the spike from the sensor. This is typically done by twisting the spike part of the instrument to release these components.
167 -)))
168 -1. (((
169 -**Setting Nodes in the Charging Box**:
170 -
171 -* Place up to 16 nodes into the charging box, arranging them with the spikes pointing upwards. This configuration is essential for proper connection and efficient charging.
172 -)))
173 -1. (((
174 -**Monitoring the Charging Process**:
175 -
176 -* Once the nodes are set in the charging box and the charging process begins, red lights adjacent to the batteries will illuminate. These lights indicate that charging is underway.
177 -* Observe the transition of the lights from steady red to orange, then to green, and finally to flashing green. A flashing green light signifies that the batteries are fully charged.
178 -)))
179 -1. (((
180 -**Updating Charge Status**:
181 -
182 -* During the charging period, take this opportunity to update the status of each unit. Check the //"C"// box on your temporary labels to indicate that the unit has been successfully charged.
183 -* This step is crucial for tracking the charging status of multiple units, especially when handling a large number of nodes.
184 -)))
185 -
186 -----
187 -
188 -=== **Downloading and Converting Seismic Data to MiniSeed Format** ===
189 -
190 -==== **Node Registration and Software Setup** ====
191 -
192 -1. (((
193 -**Registering Nodes in the System**:
194 -
195 -* To begin, register the nodes in the system so the software can recognize them.
196 -* Navigate to the installation folder of “SmartSoloApps SoloLite”.
197 -* Right-click on deviceconfig.exe and choose “run as an administrator”. Save the file to the “deviceconfig” directory (refer to the snapshot below).
198 -* To avoid double registration, replace the file each time you register a new node.
199 -)))
200 -1. (((
201 -**Creating a New Project in SoloLite**:
202 -
203 -* Open the “SoloLite” software.
204 -* Go to “File” and create a new project. Don't worry about finding the exact 16 nodes used in script writing.
205 -* Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script.
206 -)))
207 -
208 -==== **Data Downloading Process** ====
209 -
210 -1. (((
211 -**Initiating Data Download**:
212 -
213 -* Once a new project is created, the Data Transfer View panel will display connected nodes with details like series number and data size.
214 -* If “Prospect not matched” appears, it simply means the new project doesn’t match the original programming project. This is not a concern.
215 -* Select all nodes and right-click to “force download”. This starts the download process.
216 -* Completed downloads will appear as new folders in the Downloaded Data panel.
217 -)))
218 -1. (((
219 -**Exporting Data in Readable Format**:
220 -
221 -* Go to the “Tool” menu and select “export seismic data”.
222 -* Tailor other parameters to personal preference and ensure "Sample Interval" matches the setting used during node reset.
223 -* Click “prepare” followed by “run” to start reformatting. Monitor this process in the small panel at the bottom left.
224 -* (% class="box warningmessage" %)
225 -(((
226 -* **Ensure to export data as "COUNTS", not "mV".**
227 -
228 -* **Set "Remove Gain" to the same decibel gain as during programming (ANU usually sets this to 18 db, but double-check).**
229 -)))
230 -)))
231 -
232 -==== **Handling Nodes During Download** ====
233 -
234 -1. (((
235 -**Monitoring Download Indicators**:
236 -
237 -* During download, green lights on nodes will blink, and associated red lights on the rack will flash.
238 -* Disconnect nodes properly before unplugging anything.
239 -* Be cautious: if the laptop enters sleep mode, the download will pause.
240 -)))
241 -1. (((
242 -//**Investment in Storage Hardware**~://
243 -
244 -* (% class="box warningmessage" %)
245 -(((
246 -* **Use fast external hard drives to avoid limitations in data harvesting.**
247 -
248 -* **Recommended specifications: USB-C, USB 3.0, and 4+ Tb of space.**
249 -)))
250 -)))
251 -1. (((
252 -**Metadata and Time Settings**:
253 -
254 -* Ensure all metadata is saved with the file.
255 -* System auto-determines the earliest data time as the start time. You can set it a day earlier at 00:00:00 for 24-hour data segments starting from midnight.
256 -)))
257 -1. (((
258 -**Finalizing the Download**:
259 -
260 -* After downloading, mark the //"D"// box on your temporary labels to indicate completion.
261 -
262 -
263 -
264 -)))
265 -
266 -----
267 -
268 -=== **Cleaning** ===
269 -
270 -**Procedure for Seismic Nodes:**
271 -
272 -* If the nodes are placed in a thick plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us!
273 -
274 274  = =
275 275  
276 276  = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node =
... ... @@ -280,7 +280,7 @@
280 280  == Sub-paragraph ==
281 281  
282 282  
283 -== [[image:1705196270090-364.png]] ==
42 +== ==
284 284  
285 285  
286 286  = Smart Solo BD3C-5 (5 second) Broad-Band Node =
... ... @@ -287,7 +287,9 @@
287 287  
288 288  Lorem
289 289  
49 +[[image:1705196270090-364.png]]
290 290  
51 +
291 291  == GPS Considerations ==
292 292  
293 293  The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. The BD3C will not start recording without first attaining a GPS lock.