Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/06/16 07:51
From version 34.2
edited by Sima Mousavi
on 2024/01/24 17:41
on 2024/01/24 17:41
Change comment:
There is no comment for this version
To version 24.1
edited by Sima Mousavi
on 2024/01/24 16:27
on 2024/01/24 16:27
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -79,9 +79,7 @@ 79 79 80 80 === === 81 81 82 -* ((( 83 83 === **6- Data Sharing and Metadata Creation** === 84 -))) 85 85 86 86 **GPS Data**: 87 87 ... ... @@ -109,7 +109,7 @@ 109 109 Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness. 110 110 ))) 111 111 112 - ----110 += = 113 113 114 114 === **Seismic Station Demobilization and Documentation** === 115 115 ... ... @@ -151,116 +151,20 @@ 151 151 * Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport. 152 152 ))) 153 153 154 ----- 155 155 156 -=== **Charging Procedure for Seismic Nodes** === 157 157 158 -1. ((( 159 -**Preparation for Charging**: 160 160 161 -* Before charging, ensure each node is clean. This involves removing any dirt or debris to maintain the integrity of the equipment and ensure effective charging. 162 -))) 163 -1. ((( 164 -**Disassembling the Node**: 165 165 166 -* Carefully remove the battery and the spike from the sensor. This is typically done by twisting the spike part of the instrument to release these components. 167 -))) 168 -1. ((( 169 -**Setting Nodes in the Charging Box**: 170 170 171 -* Place up to 16 nodes into the charging box, arranging them with the spikes pointing upwards. This configuration is essential for proper connection and efficient charging. 172 -))) 173 -1. ((( 174 -**Monitoring the Charging Process**: 175 175 176 -* Once the nodes are set in the charging box and the charging process begins, red lights adjacent to the batteries will illuminate. These lights indicate that charging is underway. 177 -* Observe the transition of the lights from steady red to orange, then to green, and finally to flashing green. A flashing green light signifies that the batteries are fully charged. 178 -))) 179 -1. ((( 180 -**Updating Charge Status**: 181 181 182 -* During the charging period, take this opportunity to update the status of each unit. Check the //"C"// box on your temporary labels to indicate that the unit has been successfully charged. 183 -* This step is crucial for tracking the charging status of multiple units, especially when handling a large number of nodes. 184 -))) 185 185 186 ----- 187 187 188 -=== **Downloading and Converting Seismic Data to MiniSeed Format** === 189 189 190 -==== **Node Registration and Software Setup** ==== 191 191 192 -1. ((( 193 -**Registering Nodes in the System**: 194 194 195 -* To begin, register the nodes in the system so the software can recognize them. 196 -* Navigate to the installation folder of “SmartSoloApps SoloLite”. 197 -* Right-click on deviceconfig.exe and choose “run as an administrator”. Save the file to the “deviceconfig” directory (refer to the snapshot below). 198 -* To avoid double registration, replace the file each time you register a new node. 199 -))) 200 -1. ((( 201 -**Creating a New Project in SoloLite**: 202 202 203 -* Open the “SoloLite” software. 204 -* Go to “File” and create a new project. Don't worry about finding the exact 16 nodes used in script writing. 205 -* Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script. 206 -))) 207 207 208 -==== **Data Downloading Process** ==== 209 - 210 -1. ((( 211 -**Initiating Data Download**: 212 - 213 -* Once a new project is created, the Data Transfer View panel will display connected nodes with details like series number and data size. 214 -* If “Prospect not matched” appears, it simply means the new project doesn’t match the original programming project. This is not a concern. 215 -* Select all nodes and right-click to “force download”. This starts the download process. 216 -* Completed downloads will appear as new folders in the Downloaded Data panel. 217 -))) 218 -1. ((( 219 -**Exporting Data in Readable Format**: 220 - 221 -* Go to the “Tool” menu and select “export seismic data”. 222 -* Tailor other parameters to personal preference and ensure "Sample Interval" matches the setting used during node reset. 223 -* Click “prepare” followed by “run” to start reformatting. Monitor this process in the small panel at the bottom left. 224 -* (% class="box warningmessage" %) 225 -((( 226 -* **Ensure to export data as "COUNTS", not "mV".** 227 - 228 - 229 -* **Set "Remove Gain" to the same decibel gain as during programming (ANU usually sets this to 18 db, but double-check).** 230 -))) 231 -))) 232 - 233 -==== **Handling Nodes During Download** ==== 234 - 235 -1. ((( 236 -**Monitoring Download Indicators**: 237 - 238 -* During download, green lights on nodes will blink, and associated red lights on the rack will flash. 239 -* Disconnect nodes properly before unplugging anything. 240 -* Be cautious: if the laptop enters sleep mode, the download will pause. 241 -))) 242 -1. ((( 243 -**Investment in Storage Hardware**: 244 - 245 -* (% class="box warningmessage" %) 246 -((( 247 -* **Use fast external hard drives to avoid limitations in data harvesting.** 248 - 249 -* **Recommended specifications: USB-C, USB 3.0, and 4+ Tb of space.** 250 -))) 251 -))) 252 -1. ((( 253 -**Metadata and Time Settings**: 254 - 255 -* Ensure all metadata is saved with the file. 256 -* System auto-determines the earliest data time as the start time. You can set it a day earlier at 00:00:00 for 24-hour data segments starting from midnight. 257 -))) 258 -1. ((( 259 -**Finalizing the Download**: 260 - 261 -* After downloading, mark the //"D"// box on your temporary labels to indicate completion. 262 -))) 263 - 264 264 = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node = 265 265 266 266 blahblah