Last modified by robert on 2025/06/16 07:51

From version 29.1
edited by Sima Mousavi
on 2024/01/24 17:34
Change comment: There is no comment for this version
To version 24.1
edited by Sima Mousavi
on 2024/01/24 16:27
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -79,9 +79,7 @@
79 79  
80 80  === ===
81 81  
82 -* (((
83 83  === **6- Data Sharing and Metadata Creation** ===
84 -)))
85 85  
86 86  **GPS Data**:
87 87  
... ... @@ -109,7 +109,7 @@
109 109  Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness.
110 110  )))
111 111  
112 -----
110 += =
113 113  
114 114  === **Seismic Station Demobilization and Documentation** ===
115 115  
... ... @@ -151,129 +151,20 @@
151 151  * Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport.
152 152  )))
153 153  
154 -----
155 155  
156 -=== **Charging Procedure for Seismic Nodes** ===
157 157  
158 -1. (((
159 -**Preparation for Charging**:
160 160  
161 -* Before charging, ensure each node is clean. This involves removing any dirt or debris to maintain the integrity of the equipment and ensure effective charging.
162 -)))
163 -1. (((
164 -**Disassembling the Node**:
165 165  
166 -* Carefully remove the battery and the spike from the sensor. This is typically done by twisting the spike part of the instrument to release these components.
167 -)))
168 -1. (((
169 -**Setting Nodes in the Charging Box**:
170 170  
171 -* Place up to 16 nodes into the charging box, arranging them with the spikes pointing upwards. This configuration is essential for proper connection and efficient charging.
172 -)))
173 -1. (((
174 -**Monitoring the Charging Process**:
175 175  
176 -* Once the nodes are set in the charging box and the charging process begins, red lights adjacent to the batteries will illuminate. These lights indicate that charging is underway.
177 -* Observe the transition of the lights from steady red to orange, then to green, and finally to flashing green. A flashing green light signifies that the batteries are fully charged.
178 -)))
179 -1. (((
180 -**Updating Charge Status**:
181 181  
182 -* During the charging period, take this opportunity to update the status of each unit. Check the "C" box on your temporary labels to indicate that the unit has been successfully charged.
183 -* This step is crucial for tracking the charging status of multiple units, especially when handling a large number of nodes.
184 -)))
185 185  
186 -----
187 187  
188 -=== **Downloading and Converting Seismic Data to MiniSeed Format** ===
189 189  
190 -==== **Node Registration and Software Setup** ====
191 191  
192 -1. (((
193 -**Registering Nodes in the System**:
194 194  
195 -* To begin, register the nodes in the system so the software can recognize them.
196 -* Navigate to the installation folder of “SmartSoloApps SoloLite”.
197 -* Right-click on deviceconfig.exe and choose “run as an administrator”. Save the file to the “deviceconfig” directory (refer to the snapshot below).
198 -* To avoid double registration, replace the file each time you register a new node.
199 -)))
200 -1. (((
201 -**Creating a New Project in SoloLite**:
202 202  
203 -* Open the “SoloLite” software.
204 -* Go to “File” and create a new project. Don't worry about finding the exact 16 nodes used in script writing.
205 -* Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script.
206 -)))
207 207  
208 -==== **Data Downloading Process** ====
209 -
210 -1. (((
211 -**Initiating Data Download**:
212 -
213 -* Once a new project is created, the Data Transfer View panel will display connected nodes with details like series number and data size.
214 -* If “Prospect not matched” appears, it simply means the new project doesn’t match the original programming project. This is not a concern.
215 -* Select all nodes and right-click to “force download”. This starts the download process.
216 -* Completed downloads will appear as new folders in the Downloaded Data panel.
217 -)))
218 -1. (((
219 -**Exporting Data in Readable Format**:
220 -
221 -* Go to the “Tool” menu and select “export seismic data”.
222 -* Tailor other parameters to personal preference and ensure "Sample Interval" matches the setting used during node reset.
223 -* Click “prepare” followed by “run” to start reformatting. Monitor this process in the small panel at the bottom left.
224 -* (% class="box warningmessage" %)
225 -(((
226 -Ensure to export data as "COUNTS", not "mV".
227 -)))
228 -)))
229 -
230 -* (% class="box warningmessage" %)
231 -(((
232 -Ensure to export data as "COUNTS", not "mV".
233 -)))
234 -* (% class="box warningmessage" %)
235 -(((
236 -Set "Remove Gain" to the same decibel gain as during programming (ANU usually sets this to 18 db, but double-check).
237 -)))
238 -
239 -==== **Handling Nodes During Download** ====
240 -
241 -1. (((
242 -**Monitoring Download Indicators**:
243 -
244 -* During download, green lights on nodes will blink, and associated red lights on the rack will flash.
245 -* Disconnect nodes properly before unplugging anything.
246 -* Be cautious: if the laptop enters sleep mode, the download will pause.
247 -)))
248 -1. (((
249 -**Investment in Storage Hardware**:
250 -
251 -* (% class="box warningmessage" %)
252 -(((
253 -Use fast external hard drives to avoid limitations in data harvesting.
254 -)))
255 -* (% class="box warningmessage" %)
256 -(((
257 -Recommended specifications: USB-C, USB 3.0, and 4+ Tb of space.
258 -)))
259 -)))
260 -1. (((
261 -**Metadata and Time Settings**:
262 -
263 -* Ensure all metadata is saved with the file.
264 -* System auto-determines the earliest data time as the start time. You can set it a day earlier at 00:00:00 for 24-hour data segments starting from midnight.
265 -)))
266 -1. (((
267 -**Finalizing the Download**:
268 -
269 -* After downloading, mark the "D" box on your temporary labels to indicate completion.
270 -)))
271 -
272 -
273 -
274 -
275 -
276 -
277 277  = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node =
278 278  
279 279  blahblah