Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/06/16 07:51
From version 24.1
edited by Sima Mousavi
on 2024/01/24 16:27
on 2024/01/24 16:27
Change comment:
There is no comment for this version
To version 21.1
edited by Sima Mousavi
on 2024/01/18 17:26
on 2024/01/18 17:26
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -4,11 +4,8 @@ 4 4 ((( 5 5 = **Node Setup** = 6 6 7 -Short term (~~30 day) battery powered nodes . The default gain should be 24 db for the 16HR-3C and 6 db for the BD3C-57 +Short term (~~30 day) battery powered nodes 8 8 9 - 10 -~*~**this needs to be reformatted 11 - 12 12 == **Pre-Fieldwork Preparation** == 13 13 14 14 (% class="box infomessage" %) ... ... @@ -15,9 +15,7 @@ 15 15 ((( 16 16 (% class="box warningmessage" %) 17 17 ((( 18 -**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING** 19 - 20 -**Plan on 1 Tb to store ALL data for 50 nodes @ 250 Hz and a single ~~30 day occupation** 15 +**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING ** 21 21 ))) 22 22 ))) 23 23 ... ... @@ -79,6 +79,8 @@ 79 79 80 80 === === 81 81 77 +=== === 78 + 82 82 === **6- Data Sharing and Metadata Creation** === 83 83 84 84 **GPS Data**: ... ... @@ -109,60 +109,6 @@ 109 109 110 110 = = 111 111 112 -=== **Seismic Station Demobilization and Documentation** === 113 - 114 -1. ((( 115 -**Preparation for Demobilization**: 116 - 117 -* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag. 118 -))) 119 -1. ((( 120 -**Locating the instrument**: 121 - 122 -* Use the downloaded GPS file to accurately locate the node for demobilization. 123 -* Import this KMZ file onto your phone for easy reference and location tracking. 124 -* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location. 125 -))) 126 -1. ((( 127 -**Labeling Instruments for Demobilization**: 128 - 129 -* Write the station name and the instrument’s serial number on a label. 130 -* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label. 131 -* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data. 132 -))) 133 -1. ((( 134 -**Photographing the Setup Node**: 135 - 136 -* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__. 137 -* This photo serves as a final record of the instrument’s condition and orientation at the time of removal. 138 -))) 139 -1. ((( 140 -**Logging Demobilization Details**: 141 - 142 -* Use the field logbook to note the time of demobilization, serial numbers, and station name. 143 -* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors. 144 -))) 145 -1. ((( 146 -**Final Checks and Equipment Removal**: 147 - 148 -* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken. 149 -* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport. 150 -))) 151 - 152 - 153 - 154 - 155 - 156 - 157 - 158 - 159 - 160 - 161 - 162 - 163 - 164 - 165 - 166 166 = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node = 167 167 168 168 blahblah