Last modified by robert on 2025/08/21 13:08

From version 23.1
edited by robert
on 2024/01/24 11:33
Change comment: There is no comment for this version
To version 37.2
edited by Sima Mousavi
on 2024/01/25 14:31
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.robert
1 +XWiki.sima
Content
... ... @@ -79,9 +79,9 @@
79 79  
80 80  === ===
81 81  
82 -=== ===
83 -
82 +* (((
84 84  === **6- Data Sharing and Metadata Creation** ===
84 +)))
85 85  
86 86  **GPS Data**:
87 87  
... ... @@ -109,6 +109,191 @@
109 109  Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness.
110 110  )))
111 111  
112 +----
113 +
114 +=== **Seismic Station Demobilization and Documentation** ===
115 +
116 +1. (((
117 +**Preparation for Demobilization**:
118 +
119 +* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag.
120 +)))
121 +1. (((
122 +**Locating the instrument**:
123 +
124 +* Use the downloaded GPS file to accurately locate the node for demobilization.
125 +* Import this KMZ file onto your phone for easy reference and location tracking.
126 +* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location.
127 +)))
128 +1. (((
129 +**Labeling Instruments for Demobilization**:
130 +
131 +* Write the station name and the instrument’s serial number on a label.
132 +* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label.
133 +* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data.
134 +)))
135 +1. (((
136 +**Photographing the Setup Node**:
137 +
138 +* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__.
139 +* This photo serves as a final record of the instrument’s condition and orientation at the time of removal.
140 +)))
141 +1. (((
142 +**Logging Demobilization Details**:
143 +
144 +* Use the field logbook to note the time of demobilization, serial numbers, and station name.
145 +* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors.
146 +)))
147 +1. (((
148 +**Final Checks and Equipment Removal**:
149 +
150 +* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken.
151 +* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport.
152 +)))
153 +
154 +[[image:blob:https://anu365-my.sharepoint.com/aba1fadc-c966-4177-9f2c-7cbd734bff46]] [[image:blob:https://anu365-my.sharepoint.com/aba1fadc-c966-4177-9f2c-7cbd734bff46]]
155 +
156 +----
157 +
158 +=== **Charging Procedure for Seismic Nodes** ===
159 +
160 +1. (((
161 +**Preparation for Charging**:
162 +
163 +* Before charging, ensure each node is clean. This involves removing any dirt or debris to maintain the integrity of the equipment and ensure effective charging.
164 +)))
165 +1. (((
166 +**Disassembling the Node**:
167 +
168 +* Carefully remove the battery and the spike from the sensor. This is typically done by twisting the spike part of the instrument to release these components.
169 +)))
170 +1. (((
171 +**Setting Nodes in the Charging Box**:
172 +
173 +* Place up to 16 nodes into the charging box, arranging them with the spikes pointing upwards. This configuration is essential for proper connection and efficient charging.
174 +)))
175 +1. (((
176 +**Monitoring the Charging Process**:
177 +
178 +* Once the nodes are set in the charging box and the charging process begins, red lights adjacent to the batteries will illuminate. These lights indicate that charging is underway.
179 +* Observe the transition of the lights from steady red to orange, then to green, and finally to flashing green. A flashing green light signifies that the batteries are fully charged.
180 +)))
181 +1. (((
182 +**Updating Charge Status**:
183 +
184 +* During the charging period, take this opportunity to update the status of each unit. Check the //"C"// box on your temporary labels to indicate that the unit has been successfully charged.
185 +* This step is crucial for tracking the charging status of multiple units, especially when handling a large number of nodes.
186 +)))
187 +
188 +[[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center"]]
189 +
190 +
191 +
192 +
193 +[[image:1706153354750-415.png]]
194 +
195 +----
196 +
197 +=== **Downloading and Converting Seismic Data to MiniSeed Format** ===
198 +
199 +==== **Node Registration and Software Setup** ====
200 +
201 +1. (((
202 +**Registering Nodes in the System**:
203 +
204 +* To begin, register the nodes in the system so the software can recognize them.
205 +* Navigate to the installation folder of “SmartSoloApps SoloLite”.
206 +* Right-click on deviceconfig.exe and choose “run as an administrator”. Save the file to the “deviceconfig” directory (refer to the snapshot below).
207 +* To avoid double registration, replace the file each time you register a new node.
208 +)))
209 +1. (((
210 +**Creating a New Project in SoloLite**:
211 +
212 +* Open the “SoloLite” software.
213 +* Go to “File” and create a new project. Don't worry about finding the exact 16 nodes used in script writing.
214 +* Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script.
215 +)))
216 +
217 +==== **Data Downloading Process** ====
218 +
219 +1. (((
220 +**Initiating Data Download**:
221 +
222 +* Once a new project is created, the Data Transfer View panel will display connected nodes with details like series number and data size.
223 +* If “Prospect not matched” appears, it simply means the new project doesn’t match the original programming project. This is not a concern.
224 +* Select all nodes and right-click to “force download”. This starts the download process.
225 +* Completed downloads will appear as new folders in the Downloaded Data panel.
226 +)))
227 +1. (((
228 +**Exporting Data in Readable Format**:
229 +
230 +* Go to the “Tool” menu and select “export seismic data”.
231 +* Tailor other parameters to personal preference and ensure "Sample Interval" matches the setting used during node reset.
232 +* Click “prepare” followed by “run” to start reformatting. Monitor this process in the small panel at the bottom left.
233 +* (% class="box warningmessage" %)
234 +(((
235 +* **Ensure to export data as "COUNTS", not "mV".**
236 +
237 +* **Set "Remove Gain" to the same decibel gain as during programming (ANU usually sets this to 18 db, but double-check).**
238 +)))
239 +)))
240 +
241 +==== **Handling Nodes During Download** ====
242 +
243 +1. (((
244 +**Monitoring Download Indicators**:
245 +
246 +* During download, green lights on nodes will blink, and associated red lights on the rack will flash.
247 +* Disconnect nodes properly before unplugging anything.
248 +* Be cautious: if the laptop enters sleep mode, the download will pause.
249 +)))
250 +1. (((
251 +//**Investment in Storage Hardware**~://
252 +
253 +* (% class="box warningmessage" %)
254 +(((
255 +* **Use fast external hard drives to avoid limitations in data harvesting.**
256 +
257 +* **Recommended specifications: USB-C, USB 3.0, and 4+ Tb of space.**
258 +)))
259 +)))
260 +1. (((
261 +**Metadata and Time Settings**:
262 +
263 +* Ensure all metadata is saved with the file.
264 +* System auto-determines the earliest data time as the start time. You can set it a day earlier at 00:00:00 for 24-hour data segments starting from midnight.
265 +)))
266 +1. (((
267 +**Finalizing the Download**:
268 +
269 +* After downloading, mark the //"D"// box on your temporary labels to indicate completion.
270 +
271 +
272 +)))
273 +
274 +[[image:1706153266647-145.png]]
275 +
276 +[[Caption>>image:1705195543887-977.png]]
277 +
278 +
279 +[[Caption>>image:1705195543890-537.png||data-xwiki-image-style-alignment="center"]]
280 +
281 +
282 +
283 +[[Caption>>image:1705195543891-334.png||data-xwiki-image-style-alignment="center"]]
284 +
285 +
286 +
287 +[[image:1705195543898-365.png||data-xwiki-image-style-alignment="center"]]
288 +
289 +----
290 +
291 +=== **Cleaning** ===
292 +
293 +**Procedure for Seismic Nodes:**
294 +
295 +* If the nodes are placed in a thick plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us!
296 +
112 112  = =
113 113  
114 114  = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node =
... ... @@ -118,7 +118,7 @@
118 118  == Sub-paragraph ==
119 119  
120 120  
121 -== ==
306 +== [[image:1705196270090-364.png]] ==
122 122  
123 123  
124 124  = Smart Solo BD3C-5 (5 second) Broad-Band Node =
... ... @@ -125,9 +125,7 @@
125 125  
126 126  Lorem
127 127  
128 -[[image:1705196270090-364.png]]
129 129  
130 -
131 131  == GPS Considerations ==
132 132  
133 133  The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. The BD3C will not start recording without first attaining a GPS lock.
... ... @@ -211,7 +211,9 @@
211 211  
212 212  Use existing field logbook to note time, SN and station name plus any notes – including any issues with orientation or level or anything else
213 213  
397 +[[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center"]]
214 214  
399 +
215 215  == Charging ==
216 216  
217 217  Clean node prior to charging and harvesting the data
... ... @@ -224,10 +224,8 @@
224 224  
225 225  This is a good time to check the "C" box on your temporary labels to mark that the unit has been charged
226 226  
227 -[[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center"]]
228 228  
229 229  
230 -
231 231  == Downloading and Converting Data to MiniSeed ==
232 232  
233 233  
1706153266647-145.png
Author
... ... @@ -1,0 +1,1 @@
1 +XWiki.sima
Size
... ... @@ -1,0 +1,1 @@
1 +1.7 MB
Content
1706153354750-415.png
Author
... ... @@ -1,0 +1,1 @@
1 +XWiki.sima
Size
... ... @@ -1,0 +1,1 @@
1 +2.1 MB
Content