Changes for page SmartSolo Seismometers

Last modified by Kimberley on 2025/05/26 13:10

From version 23.1
edited by robert
on 2024/01/24 11:33
Change comment: There is no comment for this version
To version 24.1
edited by Sima Mousavi
on 2024/01/24 16:27
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.robert
1 +XWiki.sima
Content
... ... @@ -79,8 +79,6 @@
79 79  
80 80  === ===
81 81  
82 -=== ===
83 -
84 84  === **6- Data Sharing and Metadata Creation** ===
85 85  
86 86  **GPS Data**:
... ... @@ -111,6 +111,60 @@
111 111  
112 112  = =
113 113  
112 +=== **Seismic Station Demobilization and Documentation** ===
113 +
114 +1. (((
115 +**Preparation for Demobilization**:
116 +
117 +* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag.
118 +)))
119 +1. (((
120 +**Locating the instrument**:
121 +
122 +* Use the downloaded GPS file to accurately locate the node for demobilization.
123 +* Import this KMZ file onto your phone for easy reference and location tracking.
124 +* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location.
125 +)))
126 +1. (((
127 +**Labeling Instruments for Demobilization**:
128 +
129 +* Write the station name and the instrument’s serial number on a label.
130 +* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label.
131 +* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data.
132 +)))
133 +1. (((
134 +**Photographing the Setup Node**:
135 +
136 +* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__.
137 +* This photo serves as a final record of the instrument’s condition and orientation at the time of removal.
138 +)))
139 +1. (((
140 +**Logging Demobilization Details**:
141 +
142 +* Use the field logbook to note the time of demobilization, serial numbers, and station name.
143 +* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors.
144 +)))
145 +1. (((
146 +**Final Checks and Equipment Removal**:
147 +
148 +* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken.
149 +* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport.
150 +)))
151 +
152 +
153 +
154 +
155 +
156 +
157 +
158 +
159 +
160 +
161 +
162 +
163 +
164 +
165 +
114 114  = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node =
115 115  
116 116  blahblah