... ... @@ -1,1 +1,1 @@
1 -XWiki.robert
1 +XWiki.sima
Content
... ... @@ -4,8 +4,11 @@
4 4  (((
5 5  = **Node Setup** =
6 6  
7 -Short term (~~30 day) battery powered nodes
7 +Short term (~~30 day) battery powered nodes. The default gain should be 24 db for the 16HR-3C and 6 db for the BD3C-5
8 8  
9 +
10 +~*~**this needs to be reformatted
11 +
9 9  == **Pre-Fieldwork Preparation** ==
10 10  
11 11  (% class="box infomessage" %)
... ... @@ -76,9 +76,9 @@
76 76  
77 77  === ===
78 78  
79 -=== ===
80 -
82 +* (((
81 81  === **6- Data Sharing and Metadata Creation** ===
84 +)))
82 82  
83 83  **GPS Data**:
84 84  
... ... @@ -106,6 +106,168 @@
106 106  Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness.
107 107  )))
108 108  
112 +----
113 +
114 +=== **Seismic Station Demobilization and Documentation** ===
115 +
116 +1. (((
117 +**Preparation for Demobilization**:
118 +
119 +* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag.
120 +)))
121 +1. (((
122 +**Locating the instrument**:
123 +
124 +* Use the downloaded GPS file to accurately locate the node for demobilization.
125 +* Import this KMZ file onto your phone for easy reference and location tracking.
126 +* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location.
127 +)))
128 +1. (((
129 +**Labeling Instruments for Demobilization**:
130 +
131 +* Write the station name and the instrument’s serial number on a label.
132 +* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label.
133 +* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data.
134 +)))
135 +1. (((
136 +**Photographing the Setup Node**:
137 +
138 +* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__.
139 +* This photo serves as a final record of the instrument’s condition and orientation at the time of removal.
140 +)))
141 +1. (((
142 +**Logging Demobilization Details**:
143 +
144 +* Use the field logbook to note the time of demobilization, serial numbers, and station name.
145 +* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors.
146 +)))
147 +1. (((
148 +**Final Checks and Equipment Removal**:
149 +
150 +* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken.
151 +* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport.
152 +)))
153 +
154 +----
155 +
156 +=== **Charging Procedure for Seismic Nodes** ===
157 +
158 +1. (((
159 +**Preparation for Charging**:
160 +
161 +* Before charging, ensure each node is clean. This involves removing any dirt or debris to maintain the integrity of the equipment and ensure effective charging.
162 +)))
163 +1. (((
164 +**Disassembling the Node**:
165 +
166 +* Carefully remove the battery and the spike from the sensor. This is typically done by twisting the spike part of the instrument to release these components.
167 +)))
168 +1. (((
169 +**Setting Nodes in the Charging Box**:
170 +
171 +* Place up to 16 nodes into the charging box, arranging them with the spikes pointing upwards. This configuration is essential for proper connection and efficient charging.
172 +)))
173 +1. (((
174 +**Monitoring the Charging Process**:
175 +
176 +* Once the nodes are set in the charging box and the charging process begins, red lights adjacent to the batteries will illuminate. These lights indicate that charging is underway.
177 +* Observe the transition of the lights from steady red to orange, then to green, and finally to flashing green. A flashing green light signifies that the batteries are fully charged.
178 +)))
179 +1. (((
180 +**Updating Charge Status**:
181 +
182 +* During the charging period, take this opportunity to update the status of each unit. Check the //"C"// box on your temporary labels to indicate that the unit has been successfully charged.
183 +* This step is crucial for tracking the charging status of multiple units, especially when handling a large number of nodes.
184 +)))
185 +
186 +----
187 +
188 +=== **Downloading and Converting Seismic Data to MiniSeed Format** ===
189 +
190 +==== **Node Registration and Software Setup** ====
191 +
192 +1. (((
193 +**Registering Nodes in the System**:
194 +
195 +* To begin, register the nodes in the system so the software can recognize them.
196 +* Navigate to the installation folder of “SmartSoloApps SoloLite”.
197 +* Right-click on deviceconfig.exe and choose “run as an administrator”. Save the file to the “deviceconfig” directory (refer to the snapshot below).
198 +* To avoid double registration, replace the file each time you register a new node.
199 +)))
200 +1. (((
201 +**Creating a New Project in SoloLite**:
202 +
203 +* Open the “SoloLite” software.
204 +* Go to “File” and create a new project. Don't worry about finding the exact 16 nodes used in script writing.
205 +* Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script.
206 +)))
207 +
208 +==== **Data Downloading Process** ====
209 +
210 +1. (((
211 +**Initiating Data Download**:
212 +
213 +* Once a new project is created, the Data Transfer View panel will display connected nodes with details like series number and data size.
214 +* If “Prospect not matched” appears, it simply means the new project doesn’t match the original programming project. This is not a concern.
215 +* Select all nodes and right-click to “force download”. This starts the download process.
216 +* Completed downloads will appear as new folders in the Downloaded Data panel.
217 +)))
218 +1. (((
219 +**Exporting Data in Readable Format**:
220 +
221 +* Go to the “Tool” menu and select “export seismic data”.
222 +* Tailor other parameters to personal preference and ensure "Sample Interval" matches the setting used during node reset.
223 +* Click “prepare” followed by “run” to start reformatting. Monitor this process in the small panel at the bottom left.
224 +* (% class="box warningmessage" %)
225 +(((
226 +* **Ensure to export data as "COUNTS", not "mV".**
227 +
228 +* **Set "Remove Gain" to the same decibel gain as during programming (ANU usually sets this to 18 db, but double-check).**
229 +)))
230 +)))
231 +
232 +==== **Handling Nodes During Download** ====
233 +
234 +1. (((
235 +**Monitoring Download Indicators**:
236 +
237 +* During download, green lights on nodes will blink, and associated red lights on the rack will flash.
238 +* Disconnect nodes properly before unplugging anything.
239 +* Be cautious: if the laptop enters sleep mode, the download will pause.
240 +)))
241 +1. (((
242 +//**Investment in Storage Hardware**~://
243 +
244 +* (% class="box warningmessage" %)
245 +(((
246 +* **Use fast external hard drives to avoid limitations in data harvesting.**
247 +
248 +* **Recommended specifications: USB-C, USB 3.0, and 4+ Tb of space.**
249 +)))
250 +)))
251 +1. (((
252 +**Metadata and Time Settings**:
253 +
254 +* Ensure all metadata is saved with the file.
255 +* System auto-determines the earliest data time as the start time. You can set it a day earlier at 00:00:00 for 24-hour data segments starting from midnight.
256 +)))
257 +1. (((
258 +**Finalizing the Download**:
259 +
260 +* After downloading, mark the //"D"// box on your temporary labels to indicate completion.
261 +
262 +
263 +
264 +)))
265 +
266 +----
267 +
268 +=== **Cleaning** ===
269 +
270 +**Procedure for Seismic Nodes:**
271 +
272 +* If the nodes are placed in a thick plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us!
273 +
109 109  = =
110 110  
111 111  = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node =
... ... @@ -115,7 +115,7 @@
115 115  == Sub-paragraph ==
116 116  
117 117  
118 -== ==
283 +== [[image:1705196270090-364.png]] ==
119 119  
120 120  
121 121  = Smart Solo BD3C-5 (5 second) Broad-Band Node =
... ... @@ -122,9 +122,7 @@
122 122  
123 123  Lorem
124 124  
125 -[[image:1705196270090-364.png]]
126 126  
127 -
128 128  == GPS Considerations ==
129 129  
130 130  The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. The BD3C will not start recording without first attaining a GPS lock.