Changes for page SmartSolo Seismometers
Last modified by Kimberley on 2025/05/26 13:10
From version 22.1
edited by robert
on 2024/01/23 12:51
on 2024/01/23 12:51
Change comment:
There is no comment for this version
To version 24.1
edited by Sima Mousavi
on 2024/01/24 16:27
on 2024/01/24 16:27
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. robert1 +XWiki.sima - Content
-
... ... @@ -4,8 +4,11 @@ 4 4 ((( 5 5 = **Node Setup** = 6 6 7 -Short term (~~30 day) battery powered nodes 7 +Short term (~~30 day) battery powered nodes. The default gain should be 24 db for the 16HR-3C and 6 db for the BD3C-5 8 8 9 + 10 +~*~**this needs to be reformatted 11 + 9 9 == **Pre-Fieldwork Preparation** == 10 10 11 11 (% class="box infomessage" %) ... ... @@ -76,8 +76,6 @@ 76 76 77 77 === === 78 78 79 -=== === 80 - 81 81 === **6- Data Sharing and Metadata Creation** === 82 82 83 83 **GPS Data**: ... ... @@ -108,6 +108,60 @@ 108 108 109 109 = = 110 110 112 +=== **Seismic Station Demobilization and Documentation** === 113 + 114 +1. ((( 115 +**Preparation for Demobilization**: 116 + 117 +* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag. 118 +))) 119 +1. ((( 120 +**Locating the instrument**: 121 + 122 +* Use the downloaded GPS file to accurately locate the node for demobilization. 123 +* Import this KMZ file onto your phone for easy reference and location tracking. 124 +* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location. 125 +))) 126 +1. ((( 127 +**Labeling Instruments for Demobilization**: 128 + 129 +* Write the station name and the instrument’s serial number on a label. 130 +* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label. 131 +* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data. 132 +))) 133 +1. ((( 134 +**Photographing the Setup Node**: 135 + 136 +* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__. 137 +* This photo serves as a final record of the instrument’s condition and orientation at the time of removal. 138 +))) 139 +1. ((( 140 +**Logging Demobilization Details**: 141 + 142 +* Use the field logbook to note the time of demobilization, serial numbers, and station name. 143 +* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors. 144 +))) 145 +1. ((( 146 +**Final Checks and Equipment Removal**: 147 + 148 +* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken. 149 +* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport. 150 +))) 151 + 152 + 153 + 154 + 155 + 156 + 157 + 158 + 159 + 160 + 161 + 162 + 163 + 164 + 165 + 111 111 = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node = 112 112 113 113 blahblah