Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/08/21 13:08
From version 21.1
edited by Sima Mousavi
on 2024/01/18 17:26
on 2024/01/18 17:26
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
-
Attachments (0 modified, 3 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. sima1 +XWiki.robert - Content
-
... ... @@ -2,10 +2,24 @@ 2 2 ((( 3 3 (% class="col-xs-12 col-sm-8" %) 4 4 ((( 5 += **SmartSolo Node Types and Procedures** = 6 + 7 +**SmartSolo Node Variants:** 8 + 9 +* **SmartSolo IGU 16HR 3C (5 Hz) Short Period Node** 10 +* **SmartSolo BD3C-5 (5-second) Broad-Band Node** 11 + 12 +The installation, demobilization, and data downloading procedures for both types of SmartSolo nodes – the IGU 16HR 3C Short Period Node and the BD3C-5 Broad-Band Node – are largely similar. 13 + 14 +This uniformity in process ensures ease of operation across different node types, allowing for a streamlined approach in fieldwork and data management. 15 + 16 +---- 17 + 5 5 = **Node Setup** = 6 6 7 -Short term (~~30 day) battery powered nodes 20 +Short term (~~30 day) battery powered nodes. The default gain should typically be set to 24 db for the Short Period 16HR-3C and 6 db for the Broadband BD3C-5. **This gain must be removed when exporting to miniseed.** 8 8 22 + 9 9 == **Pre-Fieldwork Preparation** == 10 10 11 11 (% class="box infomessage" %) ... ... @@ -12,7 +12,9 @@ 12 12 ((( 13 13 (% class="box warningmessage" %) 14 14 ((( 15 -**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING ** 29 +**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING** 30 + 31 +**Assume ~~1 Tb of storage for both raw and exported data per 50 nodes @ 250 Hz & 30 days** 16 16 ))) 17 17 ))) 18 18 ... ... @@ -33,11 +33,11 @@ 33 33 === **2- Node Placement** === 34 34 ))) 35 35 36 -**Protection**: Place nodes inside thick, landfill biodegradable plastic bags for environmental protection. 52 +**Protection**: Place nodes inside thick, landfill biodegradable plastic bags for environmental protection and to minimize cleaning. 37 37 38 38 **Site Analysis**: 39 39 40 -* Conductcompass measurements away from the nodeandmetallicstructures,adjusting forinclination angle.56 +* **Take compass measurements away from the sensor as it will affect your measurement.** 41 41 * Take multiple photographs from various angles to document the site setup thoroughly. 42 42 * Include a detailed site description in your notes, specifying distances and orientations from nearby landmarks (e.g. Richards garden, Te Mini steam field eastern side) 43 43 ... ... @@ -44,7 +44,7 @@ 44 44 === **3- GPS Considerations** === 45 45 46 46 (% class="wikigeneratedid" %) 47 -The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. The BD3Cwill not start recording withoutfirstattaining a GPS lock.63 +The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. These nodes will not start recording without attaining a GPS lock and repeated attempts will excessively drain the battery. 48 48 49 49 === **4- Visibility and Location Marking** === 50 50 ... ... @@ -59,28 +59,27 @@ 59 59 60 60 * **Charging Duration**: Both types of nodes take approximately 6-8 hours to fully charge from a flat state. 61 61 * **Pre-Deployment Charging**: 62 -** Although the nodes hold their charge well, it's beneficial to give them a "top up" charge rightbefore deployment.78 +** Although the nodes hold their charge well, it's beneficial to give them a "top up" charge before deployment. 63 63 64 64 * **Operational Duration**: 65 -** When recording at 250 Hz, with GPS on and Bluetooth disabled, the instruments are expected to last about 30 days per charge cycle. 81 +** When recording at 250 Hz, with GPS on and Bluetooth disabled, the instruments are expected to last about 30 days per charge cycle. If they are set to run only overnight, this can be extended to 60 days. 66 66 67 67 * **Post-Retrieval Charging**: 68 -** Do not store the instruments with completely drained batteries. 69 -** After retrieval, charge the instruments to about 50-60% (indicated as "orange" level) for optimal battery health. 70 - 84 +** After retrieval, charge the instruments to about 50-60% (indicated as "orange" level) unless they are to be immediately re-deployed. 71 71 * **Storage and Shipping Charge Level**: 72 72 ** Maintain a battery charge level of around 50-60% for both storage and shipping purposes. 73 73 ** This charge level is recommended to prevent battery damage and is safe for transportation. 88 +** Nodes should not be stored fully charged, and it **they should especially not be stored with 0 charge.** 74 74 75 75 === === 76 76 77 -=== === 78 - 92 +((( 79 79 === **6- Data Sharing and Metadata Creation** === 94 +))) 80 80 81 81 **GPS Data**: 82 82 83 -* Download the GPS file to a laptop. 98 +* Download the GPS file to a laptop. (???) 84 84 * Share this file on a drive accessible to all team members for uniform understanding of node locations. 85 85 86 86 **Photo Sharing**: ... ... @@ -90,7 +90,7 @@ 90 90 91 91 **Metadata File**: 92 92 93 -* Create a metadata XML file for eachnode,whichisessential fordataorganisation andfuturereference.108 +* Create and organize metadata via the ANU metadata standard (~*~*add example) 94 94 95 95 === **7- Additional Best Practices** === 96 96 ... ... @@ -104,193 +104,208 @@ 104 104 Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness. 105 105 ))) 106 106 107 - = =122 +---- 108 108 109 -= Sma rtSoloIGU 16HR 3C (5 Hz) ShortPeriodNode =124 +=== **Seismic Station Demobilization and Documentation** === 110 110 111 -blahblah 126 +1. ((( 127 +**Preparation for Demobilization**: 112 112 113 -== Sub-paragraph == 129 +* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag. 130 +))) 131 +1. ((( 132 +**Locating the instrument**: 114 114 134 +* Use the downloaded GPS file to accurately locate the node for demobilization. 135 +* Import this KMZ file onto your phone for easy reference and location tracking. 136 +* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location. 137 +))) 138 +1. ((( 139 +**Labeling Instruments for Demobilization**: 115 115 116 -== == 141 +* Write the station name and the instrument’s serial number on a label. 142 +* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label. 143 +* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data. 144 +))) 145 +1. ((( 146 +**Photographing the Setup Node**: 117 117 148 +* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__. 149 +* This photo serves as a final record of the instrument’s condition and orientation at the time of removal. 150 +))) 151 +1. ((( 152 +**Logging Demobilization Details**: 118 118 119 -= Smart Solo BD3C-5 (5 second) Broad-Band Node = 154 +* Use the field logbook to note the time of demobilization, serial numbers, and station name. 155 +* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors. 156 +))) 157 +1. ((( 158 +**Final Checks and Equipment Removal**: 120 120 121 -Lorem 160 +* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken. 161 +* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport. 122 122 123 -[[image:1705196270090-364.png]] 163 + 164 +))) 124 124 166 +[[image:1706153556166-231.jpeg||data-xwiki-image-style-alignment="center" height="345" width="460"]] 125 125 126 - == GPS Considerations ==168 +---- 127 127 128 - TheGPS antenna is at the topand centerof the unit, and will (usually) only receive signalwith a clearsky view directly above. The signal is able to penetrate plasticand terracotta planters anda thin layer of soil, but may struggleifthe soil layer istoo thick.The BD3C will not start recording without firstattaining a GPS lock.170 +=== **Charging Procedure for Seismic Nodes** === 129 129 130 -= Keeping the Instruments Clean = 172 +1. ((( 173 +**Preparation for Charging**: 131 131 132 - Use a(**landfill**, not //compost//) degradablebag wheninstalling tokeeptheinstrumentclean. Thiswill saveyoumanyhours oftime cleaningtheminpreparationfortheirreturn. [[Hereis a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]]demonstratingitseffectiveness.175 +* Before charging, ensure each node is clean. This involves removing any dirt or debris to maintain the integrity of the equipment and ensure effective charging. 133 133 177 + 178 +))) 179 +1. ((( 180 +**Disassembling the Node**: 134 134 135 - =ChargeTime,InstrumentLife,andChargeDuringStorage& Shipping=182 +* For the IGU-16HR, remove the battery (bottom half) from the sensor. This is done by unscrewing the spikes counter-clockwise. 136 136 137 -Both nodes take about 6-8 hours to charge from flat and hold their charge reasonably well, however you may benefit from a "top up" charge immediately prior to deploy. The instruments should last around 30 days per cycle (recording at 250hz) with GPS on cycle on and bluetooth disabled. 184 + 185 +))) 186 +1. ((( 187 +**Setting Nodes in the Charging Box**: 138 138 139 - Uponretrieval, theinstrumentsshouldnotbe stored flatasthis will damagethe batteries.It is recommended to chargethem backup "to orange"suchthat they arechargedaround ~~50-60%. This is also acceptableforshipping.189 +* Place 1-16 IGU-16HR battery components upside-down into the charger, assuring they are oriented properly. 140 140 191 + 192 +))) 193 +1. ((( 194 +**Monitoring the Charging Process**: 141 141 142 -= Best Practices and Guide = 196 +* Once the nodes are set in the charging box and the charging process begins, lights adjacent to the batteries will illuminate. These lights indicate that charging is underway. 197 +* Observe the transition of the lights from steady red to orange, then to green, and finally to flashing green. A flashing green light signifies that the batteries are fully charged. For storage, the goal is to charge them to ORANGE. 143 143 144 -== Install == 199 + 200 +))) 201 +1. ((( 202 +**Updating Charge Status**: 145 145 146 -Logbook is required (used again for pick up & metadata creation) 204 +* During the charging period, take this opportunity to update the status of each unit. Check the //"C"// box on your temporary labels to indicate that the unit has been successfully charged. 205 +* This step is crucial for tracking the charging status of multiple units, especially when handling a large number of nodes. 206 +))) 147 147 148 -- stationname208 +[[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center" height="299" width="530"]] 149 149 150 -- lat / long 151 151 152 -- team members 153 153 154 -- date and local time 155 155 156 -- SN ofsensor213 +[[image:1706153354750-415.png||data-xwiki-image-style-alignment="center" height="317" width="562"]] 157 157 158 -- notes on site215 +---- 159 159 160 - Placenodesinthick (“landfillbiodegradable”)plasticbagsinthehole217 +=== **Downloading and Converting Seismic Data to MiniSeed Format** === 161 161 162 - Takecompassmeasurementaway fromnodeand fences [make sure to adjustinclination angle]219 +==== **Node Registration and Software Setup** ==== 163 163 164 -Take many photos from the site from different angles 221 +1. ((( 222 +**Registering Nodes in the System**: 165 165 166 -Add a precise site description to the notes such as distances and orientations from landmarks 224 +* To begin, register the nodes in the system so the software can recognize them. 225 +* Navigate to the installation folder of “SmartSoloApps SoloLite”. 226 +* Right-click on deviceconfig.exe and choose “run as an administrator”. Save the file to the “deviceconfig” directory (refer to the snapshot below). 227 +* To avoid double registration, replace the file each time you register a new node. 228 +))) 229 +1. ((( 230 +**Creating a New Project in SoloLite**: 167 167 168 -It will be very helpful in locating the instrument if you place a flag next to it, preferably in a color other than green or yellow. 232 +* Open the “SoloLite” software. 233 +* Go to “File” and create a new project. Don't worry about finding the exact 16 nodes used in script writing. 234 +* Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script. 235 +))) 169 169 170 - Makeamark (digital)of the instrument'slocationusinga GPS device. Record the location both in your paper notesand on the GPS device.237 +==== **Data Downloading Process** ==== 171 171 172 -Download the GPS (Garmin) file to a laptop and share drive to share with other GPS devices 239 +1. ((( 240 +**Initiating Data Download**: 173 173 174 -Share photos in a shared location (Google photos, OneDrive, Dropbox, etc), but most useful are those added to a Google Maps/Earth location 242 +* Once a new project is created, the Data Transfer View panel will display connected nodes with details like series number and data size. 243 +* If “Prospect not matched” appears, it simply means the new project doesn’t match the original programming project. This is not a concern. 244 +* Select all nodes and right-click to “force download”. This starts the download process. 245 +* Completed downloads will appear as new folders in the Downloaded Data panel. 246 +))) 247 +1. ((( 248 +**Exporting Data in Readable Format**: 175 175 176 -Create metadata .xml file 250 +* Go to the “Tool” menu and select “export seismic data”. 251 +* Tailor other parameters to personal preference and ensure "Sample Interval" matches the setting used during node reset. 252 +* Click “prepare” followed by “run” to start reformatting. Monitor this process in the small panel at the bottom left. 253 +* (% class="box warningmessage" %) 254 +((( 255 +* **Ensure to export data as "COUNTS", not "mV".** 177 177 257 +* **Set "Remove Gain" to the same decibel gain as during programming** **(by default ANU sets this to 24db (a factor of 15.848932).** 258 +))) 259 +))) 178 178 179 -== Removing/Demob==261 +==== **Handling Nodes During Download** ==== 180 180 181 -Download and then use the GPS file to locate the node 263 +1. ((( 264 +**Monitoring Download Indicators**: 182 182 183 -Use Google Maps / Google Earth to create a kmz file that can then be imported onto your phone. 266 +* During download, green lights on nodes will blink, and associated red lights on the rack will flash. 267 +* Disconnect nodes properly before unplugging anything. 268 +* Be cautious: if the laptop enters sleep mode, the download will pause. 269 +))) 270 +1. ((( 271 +//**Investment in Storage Hardware**~:// 184 184 273 +* (% class="box warningmessage" %) 274 +((( 275 +* **Use fast external hard drives to avoid limitations in data harvesting.** 185 185 186 -Upload photos of the site 277 +* **Recommended specifications: USB-C, USB 3.0, and 4+ Tb of space.** 278 +))) 279 +))) 280 +1. ((( 281 +**Metadata and Time Settings**: 187 187 188 -- station name 283 +* Ensure all metadata is saved with the file. 284 +* System auto-determines the earliest data time as the start time. You can set it a day earlier at 00:00:00 for 24-hour data segments starting from midnight. 285 +))) 286 +1. ((( 287 +**Finalizing the Download**: 189 189 190 - -latitude289 +* After downloading, mark the //"D"// box on your temporary labels to indicate completion. 191 191 192 -- longitude 291 + 292 +))) 193 193 194 -- vation294 +[[image:1706153266647-145.png||data-xwiki-image-style-alignment="center" height="340" width="603"]] 195 195 196 -* SN of sensor – SN of battery (optional) 197 -* Site notes and name of location (e.g. Richards garden, Te Mini steam field eastern side) 198 198 199 -Upload photos into Google Earth and on a shared drive 200 200 201 - Before removingtheinstrument haveyour compass,tape,marker, pen, clipboard,logbook and compass ready (inotebag!).298 +[[Caption>>image:1705195543887-977.png||data-xwiki-image-style-alignment="center" height="534" width="632"]] 202 202 203 -Write the station name and the instrument’s serial number, along with 'D' and 'C' and ‘R’, each next to a box to indicate 'download' and 'charge'. Stick this label to the top of the instrument. When dealing with dozens or hundreds of these you WILL start to mix them up after a while! Having an easy visual cue keep them sorted will save you a great deal of confusion later on. 204 204 205 -Take a photo of the entire setup node with the label on it + compass 206 206 207 -Use existing field logbook to note time, SN and station name plus any notes – including any issues with orientation or level or anything else 208 208 303 +[[Caption>>image:1705195543890-537.png||data-xwiki-image-style-alignment="center" height="397" width="665"]] 209 209 210 -== Charging == 211 211 212 -Clean node prior to charging and harvesting the data 213 213 214 - Remove battery (and spike) fromthesensor bytwistinghespikepartof thenstrument307 +[[Caption>>image:1705195543891-334.png||data-xwiki-image-style-alignment="center" height="379" width="650"]] 215 215 216 -Set 16 nodes into the charging box (spikes up) 217 217 218 -Red lights on the box next to the batteries will come on and remain a steady red light while charging. This will change to orange, then to green, then to flashing green when fully charged. 219 219 220 - This isaoodo check theC" box onyourtemporarylabels to mark thatthe unitas been charged311 +[[image:1705195543898-365.png||data-xwiki-image-style-alignment="center" height="467" width="674"]] 221 221 222 - [[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center"]]313 +---- 223 223 315 +=== **Cleaning** === 224 224 317 +**Procedure for Seismic Nodes:** 225 225 226 - ==Downloading andConvertingData toMiniSeed==319 +* If the nodes are placed in a thick plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us! 227 227 228 - 229 -The first thing to do is to register the nodes in the system, so the software can recognize them. To do this, go to the folder where the “SmartSoloApps SoloLite” was installed. Then right-click the deviceconfig.exe program to “run as an administrator” and save the file to the directory of “deviceconfig” (snapshot below). Note that to avoid registering the same node twice, you can simply replace the file each time you do the registration. 230 - 231 -[[image:1705195543887-977.png]] 232 - 233 - 234 -Then open the “SoloLite” software, and just go to “File” to make a new project. In this case, you do not need to find the exact 16 nodes that were grouped for script writing. Do not worry about the settings for the seismic recordings for the next window to pop up, as the only way to reset the instruments (e.g., sampling rate, gain etc) is to write script to re-program them. 235 - 236 -[[image:1705195543890-537.png||data-xwiki-image-style-alignment="center"]] 237 - 238 - 239 -Once you create the new project, your Data Transfer View panel on the bottom right of the window will show these nodes that have properly connected to the data harvest, including series number, data size etc. It is okay if the “Prospect not matched”, which simply means the project you just created does not match the one you made to program them. Simply select all these nodes, and right click to “force download”, which will initiate the downloading process. Once they are done, you will see new folders created for each slot at your Downloaded Data panel on the top left of the window. 240 - 241 -[[image:1705195543891-334.png||data-xwiki-image-style-alignment="center"]] 242 - 243 -At this stage, it means that the raw DLL data of the recording has been downloaded successfully to your local machine. To output data in readable format, such as SAC or miniSEED, click the “Tool” menu and select “export seismic data”. The parameters here should be straightforward to set and tailored to personal reference. 244 - 245 -(% class="box warningmessage" %) 246 -((( 247 -**Please make sure that data is exported as "COUNTS" and NOT "mV"!** 321 += = 248 248 ))) 249 249 250 -(% class="box warningmessage" %) 251 -((( 252 -**Furthermore you must also set "Remove Gain" to the same decibel gain setting that was set during programming! ANU always set this to 18 db (double check) for all types of nodes.** 253 -))) 254 - 255 -A list of ANU group preferred parameters can be found at the end of this session. One thing to note is that the “Sample Interval” must be set exactly to this used to reset the nodes. Once you are done with the setting, click “prepare” before “run”. If everything works correctly, you should see the reformatting process from the small panel on the bottom left of this popped up window. 256 - 257 -Now the data should be ready. Then you can select these data and right click to output the GPS information associated with them. 258 - 259 -[[image:1705195543898-365.png||data-xwiki-image-style-alignment="center"]] 260 - 261 -When downloading, all the green lights on the nodes will blink. The associated red lights on the rack will flash when it is downloading, and make sure to disconnect the nodes before you unplug anything. Be careful: if the laptop goes to sleep, the download process will pause. 262 - 263 -(% class="box infomessage" %) 264 -((( 265 -**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING**. USB-C, USB 3.0, and 4+ Tb of space are highly recommended! 266 -))) 267 - 268 -When downloading, ensure that all metadata is saved along with the file. 269 - 270 -Start and endtime: the system will automatically find the earliest time of the data and set that as the starting time. However, you can set the time a day earlier with a sharp start of 00:00:00. In this case, all the outputted data segments will be 24 hours long starting from midnight. 271 - 272 -//Once downloaded, mark the "D" box on your temporary labels!// 273 - 274 -== Converting data == 275 - 276 -Check the data all have been converted to miniseed correctly 277 - 278 -– 3 files per station per day 279 - 280 -* Files are the same size (NOTE if having memory issues one or more of the components may have 0-1 kb) 281 -* ~~ 5 Gb / node / month 282 - 283 -//Tick ‘R’ box on the node label// 284 - 285 - 286 -== Cleaning == 287 - 288 -If the nodes are placed in a thick plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us! 289 - 290 - 291 -))) 292 - 293 - 294 294 (% class="col-xs-12 col-sm-4" %) 295 295 ((( 296 296 (% class="box" %) ... ... @@ -342,9 +342,9 @@ 342 342 |(% style="width:187px" %)**Frequency Band**|(% style="width:224px" %)5 Hz to 1652Hz 343 343 |(% style="width:187px" %)**Sensitivity**|(% style="width:224px" %)67.7 V/m/s 344 344 |(% style="width:187px" %)**Size (with spike)**|(% style="width:224px" %)103mm(L) × 95mm(W) × 187mm 345 -|(% style="width:187px" %)**Weight**|(% style="width:224px" %)2. 3kg375 +|(% style="width:187px" %)**Weight**|(% style="width:224px" %)2.4 kg 346 346 |(% style="width:187px" %)**Data Storage**|(% style="width:224px" %)64 Gb 347 -|(% style="width:187px" %)**Battery**|(% style="width:224px" %)Li _etcXXAh377 +|(% style="width:187px" %)**Battery**|(% style="width:224px" %)Lithium ion XXAh 348 348 ))) 349 349 350 350
- 1706153266647-145.png
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.sima - Size
-
... ... @@ -1,0 +1,1 @@ 1 +1.7 MB - Content
- 1706153354750-415.png
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.sima - Size
-
... ... @@ -1,0 +1,1 @@ 1 +2.1 MB - Content
- 1706153556166-231.jpeg
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.sima - Size
-
... ... @@ -1,0 +1,1 @@ 1 +839.4 KB - Content