Last modified by robert on 2025/07/16 16:40

From version 21.1
edited by Sima Mousavi
on 2024/01/18 17:26
Change comment: There is no comment for this version
To version 20.1
edited by Sima Mousavi
on 2024/01/18 17:25
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -61,13 +61,16 @@
61 61  * **Pre-Deployment Charging**:
62 62  ** Although the nodes hold their charge well, it's beneficial to give them a "top up" charge right before deployment.
63 63  
64 +
64 64  * **Operational Duration**:
65 65  ** When recording at 250 Hz, with GPS on and Bluetooth disabled, the instruments are expected to last about 30 days per charge cycle.
66 66  
68 +
67 67  * **Post-Retrieval Charging**:
68 68  ** Do not store the instruments with completely drained batteries.
69 69  ** After retrieval, charge the instruments to about 50-60% (indicated as "orange" level) for optimal battery health.
70 70  
73 +
71 71  * **Storage and Shipping Charge Level**:
72 72  ** Maintain a battery charge level of around 50-60% for both storage and shipping purposes.
73 73  ** This charge level is recommended to prevent battery damage and is safe for transportation.