Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/08/21 13:08
From version 20.1
edited by Sima Mousavi
on 2024/01/18 17:25
on 2024/01/18 17:25
Change comment:
There is no comment for this version
To version 37.1
edited by Sima Mousavi
on 2024/01/25 14:27
on 2024/01/25 14:27
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -4,8 +4,11 @@ 4 4 ((( 5 5 = **Node Setup** = 6 6 7 -Short term (~~30 day) battery powered nodes 7 +Short term (~~30 day) battery powered nodes. The default gain should be 24 db for the 16HR-3C and 6 db for the BD3C-5 8 8 9 + 10 +~*~**this needs to be reformatted 11 + 9 9 == **Pre-Fieldwork Preparation** == 10 10 11 11 (% class="box infomessage" %) ... ... @@ -12,7 +12,9 @@ 12 12 ((( 13 13 (% class="box warningmessage" %) 14 14 ((( 15 -**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING ** 18 +**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING** 19 + 20 +**Plan on 1 Tb to store ALL data for 50 nodes @ 250 Hz and a single ~~30 day occupation** 16 16 ))) 17 17 ))) 18 18 ... ... @@ -61,16 +61,13 @@ 61 61 * **Pre-Deployment Charging**: 62 62 ** Although the nodes hold their charge well, it's beneficial to give them a "top up" charge right before deployment. 63 63 64 - 65 65 * **Operational Duration**: 66 66 ** When recording at 250 Hz, with GPS on and Bluetooth disabled, the instruments are expected to last about 30 days per charge cycle. 67 67 68 - 69 69 * **Post-Retrieval Charging**: 70 70 ** Do not store the instruments with completely drained batteries. 71 71 ** After retrieval, charge the instruments to about 50-60% (indicated as "orange" level) for optimal battery health. 72 72 73 - 74 74 * **Storage and Shipping Charge Level**: 75 75 ** Maintain a battery charge level of around 50-60% for both storage and shipping purposes. 76 76 ** This charge level is recommended to prevent battery damage and is safe for transportation. ... ... @@ -77,9 +77,9 @@ 77 77 78 78 === === 79 79 80 -=== === 81 - 82 +* ((( 82 82 === **6- Data Sharing and Metadata Creation** === 84 +))) 83 83 84 84 **GPS Data**: 85 85 ... ... @@ -107,6 +107,184 @@ 107 107 Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness. 108 108 ))) 109 109 112 +---- 113 + 114 +=== **Seismic Station Demobilization and Documentation** === 115 + 116 +1. ((( 117 +**Preparation for Demobilization**: 118 + 119 +* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag. 120 +))) 121 +1. ((( 122 +**Locating the instrument**: 123 + 124 +* Use the downloaded GPS file to accurately locate the node for demobilization. 125 +* Import this KMZ file onto your phone for easy reference and location tracking. 126 +* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location. 127 +))) 128 +1. ((( 129 +**Labeling Instruments for Demobilization**: 130 + 131 +* Write the station name and the instrument’s serial number on a label. 132 +* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label. 133 +* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data. 134 +))) 135 +1. ((( 136 +**Photographing the Setup Node**: 137 + 138 +* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__. 139 +* This photo serves as a final record of the instrument’s condition and orientation at the time of removal. 140 +))) 141 +1. ((( 142 +**Logging Demobilization Details**: 143 + 144 +* Use the field logbook to note the time of demobilization, serial numbers, and station name. 145 +* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors. 146 +))) 147 +1. ((( 148 +**Final Checks and Equipment Removal**: 149 + 150 +* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken. 151 +* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport. 152 +))) 153 + 154 +---- 155 + 156 +=== **Charging Procedure for Seismic Nodes** === 157 + 158 +1. ((( 159 +**Preparation for Charging**: 160 + 161 +* Before charging, ensure each node is clean. This involves removing any dirt or debris to maintain the integrity of the equipment and ensure effective charging. 162 +))) 163 +1. ((( 164 +**Disassembling the Node**: 165 + 166 +* Carefully remove the battery and the spike from the sensor. This is typically done by twisting the spike part of the instrument to release these components. 167 +))) 168 +1. ((( 169 +**Setting Nodes in the Charging Box**: 170 + 171 +* Place up to 16 nodes into the charging box, arranging them with the spikes pointing upwards. This configuration is essential for proper connection and efficient charging. 172 +))) 173 +1. ((( 174 +**Monitoring the Charging Process**: 175 + 176 +* Once the nodes are set in the charging box and the charging process begins, red lights adjacent to the batteries will illuminate. These lights indicate that charging is underway. 177 +* Observe the transition of the lights from steady red to orange, then to green, and finally to flashing green. A flashing green light signifies that the batteries are fully charged. 178 +))) 179 +1. ((( 180 +**Updating Charge Status**: 181 + 182 +* During the charging period, take this opportunity to update the status of each unit. Check the //"C"// box on your temporary labels to indicate that the unit has been successfully charged. 183 +* This step is crucial for tracking the charging status of multiple units, especially when handling a large number of nodes. 184 +))) 185 + 186 +[[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center"]] 187 + 188 + 189 +---- 190 + 191 +=== **Downloading and Converting Seismic Data to MiniSeed Format** === 192 + 193 +==== **Node Registration and Software Setup** ==== 194 + 195 +1. ((( 196 +**Registering Nodes in the System**: 197 + 198 +* To begin, register the nodes in the system so the software can recognize them. 199 +* Navigate to the installation folder of “SmartSoloApps SoloLite”. 200 +* Right-click on deviceconfig.exe and choose “run as an administrator”. Save the file to the “deviceconfig” directory (refer to the snapshot below). 201 +* To avoid double registration, replace the file each time you register a new node. 202 +))) 203 +1. ((( 204 +**Creating a New Project in SoloLite**: 205 + 206 +* Open the “SoloLite” software. 207 +* Go to “File” and create a new project. Don't worry about finding the exact 16 nodes used in script writing. 208 +* Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script. 209 +))) 210 + 211 +==== **Data Downloading Process** ==== 212 + 213 +1. ((( 214 +**Initiating Data Download**: 215 + 216 +* Once a new project is created, the Data Transfer View panel will display connected nodes with details like series number and data size. 217 +* If “Prospect not matched” appears, it simply means the new project doesn’t match the original programming project. This is not a concern. 218 +* Select all nodes and right-click to “force download”. This starts the download process. 219 +* Completed downloads will appear as new folders in the Downloaded Data panel. 220 +))) 221 +1. ((( 222 +**Exporting Data in Readable Format**: 223 + 224 +* Go to the “Tool” menu and select “export seismic data”. 225 +* Tailor other parameters to personal preference and ensure "Sample Interval" matches the setting used during node reset. 226 +* Click “prepare” followed by “run” to start reformatting. Monitor this process in the small panel at the bottom left. 227 +* (% class="box warningmessage" %) 228 +((( 229 +* **Ensure to export data as "COUNTS", not "mV".** 230 + 231 +* **Set "Remove Gain" to the same decibel gain as during programming (ANU usually sets this to 18 db, but double-check).** 232 +))) 233 +))) 234 + 235 +==== **Handling Nodes During Download** ==== 236 + 237 +1. ((( 238 +**Monitoring Download Indicators**: 239 + 240 +* During download, green lights on nodes will blink, and associated red lights on the rack will flash. 241 +* Disconnect nodes properly before unplugging anything. 242 +* Be cautious: if the laptop enters sleep mode, the download will pause. 243 +))) 244 +1. ((( 245 +//**Investment in Storage Hardware**~:// 246 + 247 +* (% class="box warningmessage" %) 248 +((( 249 +* **Use fast external hard drives to avoid limitations in data harvesting.** 250 + 251 +* **Recommended specifications: USB-C, USB 3.0, and 4+ Tb of space.** 252 +))) 253 +))) 254 +1. ((( 255 +**Metadata and Time Settings**: 256 + 257 +* Ensure all metadata is saved with the file. 258 +* System auto-determines the earliest data time as the start time. You can set it a day earlier at 00:00:00 for 24-hour data segments starting from midnight. 259 +))) 260 +1. ((( 261 +**Finalizing the Download**: 262 + 263 +* After downloading, mark the //"D"// box on your temporary labels to indicate completion. 264 + 265 + 266 +))) 267 + 268 + 269 +[[Caption>>image:1705195543887-977.png]] 270 + 271 + 272 +[[Caption>>image:1705195543890-537.png||data-xwiki-image-style-alignment="center"]] 273 + 274 + 275 + 276 +[[Caption>>image:1705195543891-334.png||data-xwiki-image-style-alignment="center"]] 277 + 278 + 279 + 280 +[[image:1705195543898-365.png||data-xwiki-image-style-alignment="center"]] 281 + 282 +---- 283 + 284 +=== **Cleaning** === 285 + 286 +**Procedure for Seismic Nodes:** 287 + 288 +* If the nodes are placed in a thick plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us! 289 + 110 110 = = 111 111 112 112 = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node = ... ... @@ -116,7 +116,7 @@ 116 116 == Sub-paragraph == 117 117 118 118 119 -== 299 +== [[image:1705196270090-364.png]] == 120 120 121 121 122 122 = Smart Solo BD3C-5 (5 second) Broad-Band Node = ... ... @@ -123,9 +123,7 @@ 123 123 124 124 Lorem 125 125 126 -[[image:1705196270090-364.png]] 127 127 128 - 129 129 == GPS Considerations == 130 130 131 131 The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. The BD3C will not start recording without first attaining a GPS lock. ... ... @@ -209,7 +209,9 @@ 209 209 210 210 Use existing field logbook to note time, SN and station name plus any notes – including any issues with orientation or level or anything else 211 211 390 +[[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center"]] 212 212 392 + 213 213 == Charging == 214 214 215 215 Clean node prior to charging and harvesting the data ... ... @@ -222,10 +222,8 @@ 222 222 223 223 This is a good time to check the "C" box on your temporary labels to mark that the unit has been charged 224 224 225 -[[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center"]] 226 226 227 227 228 - 229 229 == Downloading and Converting Data to MiniSeed == 230 230 231 231