Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/07/16 16:40
From version 20.1
edited by Sima Mousavi
on 2024/01/18 17:25
on 2024/01/18 17:25
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. sima1 +XWiki.robert - Content
-
... ... @@ -4,8 +4,11 @@ 4 4 ((( 5 5 = **Node Setup** = 6 6 7 -Short term (~~30 day) battery powered nodes 7 +Short term (~~30 day) battery powered nodes. The default gain should be 24 db for the 16HR-3C and 6 db for the BD3C-5 8 8 9 + 10 +~*~**this needs to be reformatted 11 + 9 9 == **Pre-Fieldwork Preparation** == 10 10 11 11 (% class="box infomessage" %) ... ... @@ -12,7 +12,9 @@ 12 12 ((( 13 13 (% class="box warningmessage" %) 14 14 ((( 15 -**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING ** 18 +**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING** 19 + 20 +**Plan on 1 Tb to store ALL data for 50 nodes @ 250 Hz and a single ~~30 day occupation** 16 16 ))) 17 17 ))) 18 18 ... ... @@ -61,16 +61,13 @@ 61 61 * **Pre-Deployment Charging**: 62 62 ** Although the nodes hold their charge well, it's beneficial to give them a "top up" charge right before deployment. 63 63 64 - 65 65 * **Operational Duration**: 66 66 ** When recording at 250 Hz, with GPS on and Bluetooth disabled, the instruments are expected to last about 30 days per charge cycle. 67 67 68 - 69 69 * **Post-Retrieval Charging**: 70 70 ** Do not store the instruments with completely drained batteries. 71 71 ** After retrieval, charge the instruments to about 50-60% (indicated as "orange" level) for optimal battery health. 72 72 73 - 74 74 * **Storage and Shipping Charge Level**: 75 75 ** Maintain a battery charge level of around 50-60% for both storage and shipping purposes. 76 76 ** This charge level is recommended to prevent battery damage and is safe for transportation.