Changes for page SmartSolo Seismometers

Last modified by Kimberley on 2025/05/26 13:10

From version 20.1
edited by Sima Mousavi
on 2024/01/18 17:25
Change comment: There is no comment for this version
To version 22.1
edited by robert
on 2024/01/23 12:51
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.sima
1 +XWiki.robert
Content
... ... @@ -12,7 +12,9 @@
12 12  (((
13 13  (% class="box warningmessage" %)
14 14  (((
15 -**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING **
15 +**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING**
16 +
17 +**Plan on 1 Tb to store ALL data for 50 nodes @ 250 Hz and a single ~~30 day occupation**
16 16  )))
17 17  )))
18 18  
... ... @@ -61,16 +61,13 @@
61 61  * **Pre-Deployment Charging**:
62 62  ** Although the nodes hold their charge well, it's beneficial to give them a "top up" charge right before deployment.
63 63  
64 -
65 65  * **Operational Duration**:
66 66  ** When recording at 250 Hz, with GPS on and Bluetooth disabled, the instruments are expected to last about 30 days per charge cycle.
67 67  
68 -
69 69  * **Post-Retrieval Charging**:
70 70  ** Do not store the instruments with completely drained batteries.
71 71  ** After retrieval, charge the instruments to about 50-60% (indicated as "orange" level) for optimal battery health.
72 72  
73 -
74 74  * **Storage and Shipping Charge Level**:
75 75  ** Maintain a battery charge level of around 50-60% for both storage and shipping purposes.
76 76  ** This charge level is recommended to prevent battery damage and is safe for transportation.