Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/08/21 13:08
From version 19.1
edited by Sima Mousavi
on 2024/01/17 18:26
on 2024/01/17 18:26
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
-
Attachments (0 modified, 3 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. sima1 +XWiki.robert - Content
-
... ... @@ -2,10 +2,23 @@ 2 2 ((( 3 3 (% class="col-xs-12 col-sm-8" %) 4 4 ((( 5 += **Node Types** = 6 + 7 +ANSIR carry two types of three-channel nodes 8 + 9 +* **SmartSolo IGU 16HR 3C (5 Hz Short Period)** 10 +* **SmartSolo BD3C-5 (5-second Broad-Band)** 11 + 12 +Both have a battery capacity of around 30 days. The programming, operation, and downloading procedures for both types of SmartSolo nodes are also similar. 13 + 14 + 15 +---- 16 + 5 5 = **Node Setup** = 6 6 7 -Short term (~~30 day) battery powered nodes 19 +Short term (~~30 day) battery powered nodes. The default gain should typically be set to 24 db for the Short Period 16HR-3C and 6 db for the Broadband BD3C-5. **This gain must be removed when exporting to miniseed.** 8 8 21 + 9 9 == **Pre-Fieldwork Preparation** == 10 10 11 11 (% class="box infomessage" %) ... ... @@ -12,7 +12,9 @@ 12 12 ((( 13 13 (% class="box warningmessage" %) 14 14 ((( 15 -**~ INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING ** 28 +**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING** 29 + 30 +**Assume ~~1 Tb of storage for both raw and exported data per 50 nodes @ 250 Hz & 30 days** 16 16 ))) 17 17 ))) 18 18 ... ... @@ -30,20 +30,24 @@ 30 30 * Serial number (SN) of the sensor 31 31 * Detailed notes on the site conditions and setup 32 32 33 - 34 34 === **2- Node Placement** === 35 35 ))) 36 36 37 -**Protection**: Place nodes inside thick,landfill biodegradableplasticbagsforenvironmentalprotection.51 +**Protection**: Place nodes inside (landfill) biodegradable bags to minimize cleaning and cross-site soil contamination. 38 38 39 39 **Site Analysis**: 40 40 41 -* Conductcompass measurements away from the nodeandmetallicstructures,adjusting forinclination angle.55 +* **Take compass measurements away from the sensor as it will affect your measurement.** 42 42 * Take multiple photographs from various angles to document the site setup thoroughly. 43 43 * Include a detailed site description in your notes, specifying distances and orientations from nearby landmarks (e.g. Richards garden, Te Mini steam field eastern side) 44 44 45 -=== **3- VisibilityandLocationMarking** ===59 +=== **3- GPS Considerations** === 46 46 61 +(% class="wikigeneratedid" %) 62 +The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. These nodes will not start recording without attaining a GPS lock and repeated attempts will excessively drain the battery. 63 + 64 +=== **4- Visibility and Location Marking** === 65 + 47 47 **Flag Placement**: Position a flag, preferably in a bright color (avoid green or yellow), near the instrument to aid in its future location. 48 48 49 49 **GPS Marking**: ... ... @@ -51,11 +51,31 @@ 51 51 * Use a GPS device to mark the instrument's exact location. 52 52 * Record this location in both your paper notes and the GPS device. 53 53 54 -=== **4-Data Sharingand Metadata Creation** ===73 +=== (% style="color:inherit; font-family:inherit; font-size:max(18px, min(20px, 14.4444px + 0.462963vw))" %)**5- Charge Time, Pre-Deployment & Post-Deployment**(%%) === 55 55 75 +* **Charging Duration**: Both types of nodes take approximately 6-8 hours to fully charge from a flat state. 76 +* **Pre-Deployment Charging**: 77 +** Although the nodes hold their charge well, it's beneficial to give them a "top up" charge before deployment. 78 + 79 +* **Operational Duration**: 80 +** When recording at 250 Hz, with GPS on and Bluetooth disabled, the instruments are expected to last about 30 days per charge cycle. If they are set to run only overnight, this can be extended to 60 days. 81 + 82 +* **Post-Retrieval Charging**: 83 +** After retrieval, charge the instruments to about 50-60% (indicated as "orange" level) unless they are to be immediately re-deployed. 84 +* **Storage and Shipping Charge Level**: 85 +** Maintain a battery charge level of around 50-60% for both storage and shipping purposes. 86 +** This charge level is recommended to prevent battery damage and is safe for transportation. 87 +** Nodes should not be stored fully charged, and it **they should especially not be stored with 0 charge.** 88 + 89 +=== === 90 + 91 +((( 92 +=== **6- Data Sharing and Metadata Creation** === 93 +))) 94 + 56 56 **GPS Data**: 57 57 58 -* Download the GPS file to a laptop. 97 +* Download the GPS file to a laptop. (???) 59 59 * Share this file on a drive accessible to all team members for uniform understanding of node locations. 60 60 61 61 **Photo Sharing**: ... ... @@ -65,204 +65,222 @@ 65 65 66 66 **Metadata File**: 67 67 68 -* Create a metadata XML file for eachnode,whichisessential fordataorganisation andfuturereference.107 +* Create and organize metadata via the ANU metadata standard (~*~*add example) 69 69 70 -=== ** 5- Additional Best Practices** ===109 +=== **7- Additional Best Practices** === 71 71 72 72 * **Environmental Responsibility**: Ensure that the node placement and the materials used are environmentally responsible and adhere to local regulations. 73 73 * **Training and Familiarisation**: Make sure all team members are adequately trained in using the GPS devices, compass, and other equipment to ensure consistent and accurate data collection. 74 74 75 -= = 76 - 77 -= = 78 - 79 -= = 80 - 81 -= SmartSolo IGU 16HR 3C (5 Hz) Short Period Node = 82 - 83 -blahblah 84 - 85 -== Sub-paragraph == 86 - 87 - 88 -== == 89 - 90 - 91 -= Smart Solo BD3C-5 (5 second) Broad-Band Node = 92 - 93 -Lorem 94 - 95 -[[image:1705196270090-364.png]] 96 - 97 - 98 -== GPS Considerations == 99 - 100 -The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. The BD3C will not start recording without first attaining a GPS lock. 101 - 102 -= Keeping the Instruments Clean = 103 - 114 +* ((( 115 +==== **Keeping the Instruments Clean** ==== 116 +))) 117 +* ((( 104 104 Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness. 119 +))) 105 105 121 +---- 106 106 107 -= ChargeTime,InstrumentLife,andChargeDuring Storage & Shipping=123 +=== **Seismic Station Demobilization and Documentation** === 108 108 109 -Both nodes take about 6-8 hours to charge from flat and hold their charge reasonably well, however you may benefit from a "top up" charge immediately prior to deploy. The instruments should last around 30 days per cycle (recording at 250hz) with GPS on cycle on and bluetooth disabled. 125 +1. ((( 126 +**Preparation for Demobilization**: 110 110 111 -Upon retrieval, the instruments should not be stored flat as this will damage the batteries. It is recommended to charge them back up "to orange" such that they are charged around ~~50-60%. This is also acceptable for shipping. 128 +* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag. 129 +))) 130 +1. ((( 131 +**Locating the instrument**: 112 112 133 +* Use the downloaded GPS file to accurately locate the node for demobilization. 134 +* Import this KMZ file onto your phone for easy reference and location tracking. 135 +* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location. 136 +))) 137 +1. ((( 138 +**Labeling Instruments for Demobilization**: 113 113 114 -= Best Practices and Guide = 140 +* Write the station name and the instrument’s serial number on a label. 141 +* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label. 142 +* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data. 143 +))) 144 +1. ((( 145 +**Photographing the Setup Node**: 115 115 116 -== Install == 147 +* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__. 148 +* This photo serves as a final record of the instrument’s condition and orientation at the time of removal. 149 +))) 150 +1. ((( 151 +**Logging Demobilization Details**: 117 117 118 -Logbook is required (used again for pick up & metadata creation) 153 +* Use the field logbook to note the time of demobilization, serial numbers, and station name. 154 +* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors. 155 +))) 156 +1. ((( 157 +**Final Checks and Equipment Removal**: 119 119 120 -- station name 159 +* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken. 160 +* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport. 121 121 122 -- lat / long 162 + 163 +))) 123 123 124 -- teammembers165 +[[image:1706153556166-231.jpeg||data-xwiki-image-style-alignment="center" height="345" width="460"]] 125 125 126 -- date and local time167 +---- 127 127 128 - -SNofsensor169 +=== **Charging Procedure for Seismic Nodes** === 129 129 130 -- notes on site 171 +1. ((( 172 +**Preparation for Charging**: 131 131 132 - Place nodesinthick(“landfillbiodegradable”)plasticbagsin thehole174 +* Before charging, ensure each node is clean. This involves removing any dirt or debris to maintain the integrity of the equipment and ensure effective charging. 133 133 134 -Take compass measurement away from node and fences [make sure to adjust inclination angle] 176 + 177 +))) 178 +1. ((( 179 +**Disassembling the Node**: 135 135 136 - Take manyphotosfrom the sitefromdifferentangles181 +* For the IGU-16HR, remove the battery (bottom half) from the sensor. This is done by unscrewing the spikes counter-clockwise. 137 137 138 -Add a precise site description to the notes such as distances and orientations from landmarks 183 + 184 +))) 185 +1. ((( 186 +**Setting Nodes in the Charging Box**: 139 139 140 - Itwill beveryhelpfulin locatingtheinstrumentif youlacea flagnexttoit,preferablyina color otherthan greenoryellow.188 +* Place 1-16 IGU-16HR battery components upside-down into the charger, assuring they are oriented properly. 141 141 142 -Make a mark (digital) of the instrument's location using a GPS device. Record the location both in your paper notes and on the GPS device. 190 + 191 +))) 192 +1. ((( 193 +**Monitoring the Charging Process**: 143 143 144 -Download the GPS (Garmin) file to a laptop and share drive to share with other GPS devices 195 +* Once the nodes are set in the charging box and the charging process begins, lights adjacent to the batteries will illuminate. These lights indicate that charging is underway. 196 +* Observe the transition of the lights from steady red to orange, then to green, and finally to flashing green. A flashing green light signifies that the batteries are fully charged. For storage, the goal is to charge them to ORANGE. 145 145 146 -Share photos in a shared location (Google photos, OneDrive, Dropbox, etc), but most useful are those added to a Google Maps/Earth location 198 + 199 +))) 200 +1. ((( 201 +**Updating Charge Status**: 147 147 148 -Create metadata .xml file 203 +* During the charging period, take this opportunity to update the status of each unit. Check the //"C"// box on your temporary labels to indicate that the unit has been successfully charged. 204 +* This step is crucial for tracking the charging status of multiple units, especially when handling a large number of nodes. 205 +))) 149 149 207 +[[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center" height="299" width="530"]] 150 150 151 -== Removing/Demob == 152 152 153 -Download and then use the GPS file to locate the node 154 154 155 -Use Google Maps / Google Earth to create a kmz file that can then be imported onto your phone. 156 156 212 +[[image:1706153354750-415.png||data-xwiki-image-style-alignment="center" height="317" width="562"]] 157 157 158 - Upload photos of the site214 +---- 159 159 160 - -stationname216 +=== **Downloading and Converting Seismic Data to MiniSeed Format** === 161 161 162 - -latitude218 +==== **Node Registration and Software Setup** ==== 163 163 164 -- longitude 220 +1. ((( 221 +**Registering Nodes in the System**: 165 165 166 -- elevation 223 +* To begin, register the nodes in the system so the software can recognize them. 224 +* Navigate to the installation folder of “SmartSoloApps SoloLite”. 225 +* Right-click on deviceconfig.exe and choose “run as an administrator”. Save the file to the “deviceconfig” directory (refer to the snapshot below). 226 +* To avoid double registration, replace the file each time you register a new node. 227 +))) 228 +1. ((( 229 +**Creating a New Project in SoloLite**: 167 167 168 -* SN of sensor – SN of battery (optional) 169 -* Site notes and name of location (e.g. Richards garden, Te Mini steam field eastern side) 231 +* Open the “SoloLite” software. 232 +* Go to “File” and create a new project. Don't worry about finding the exact 16 nodes used in script writing. 233 +* Ignore the settings for seismic recordings in the subsequent window. Resetting instruments (e.g., sampling rate, gain) requires reprogramming via script. 234 +))) 170 170 171 - Uploadphotos into Google Earthandonshareddrive236 +==== **Data Downloading Process** ==== 172 172 173 -Before removing the instrument have your compass, tape, marker, pen, clipboard, logbook and compass ready (in tote bag!). 238 +1. ((( 239 +**Initiating Data Download**: 174 174 175 -Write the station name and the instrument’s serial number, along with 'D' and 'C' and ‘R’, each next to a box to indicate 'download' and 'charge'. Stick this label to the top of the instrument. When dealing with dozens or hundreds of these you WILL start to mix them up after a while! Having an easy visual cue keep them sorted will save you a great deal of confusion later on. 241 +* Once a new project is created, the Data Transfer View panel will display connected nodes with details like series number and data size. 242 +* If “Prospect not matched” appears, it simply means the new project doesn’t match the original programming project. This is not a concern. 243 +* Select all nodes and right-click to “force download”. This starts the download process. 244 +* Completed downloads will appear as new folders in the Downloaded Data panel. 245 +))) 246 +1. ((( 247 +**Exporting Data in Readable Format**: 176 176 177 -Take a photo of the entire setup node with the label on it + compass 249 +* Go to the “Tool” menu and select “export seismic data”. 250 +* Tailor other parameters to personal preference and ensure "Sample Interval" matches the setting used during node reset. 251 +* Click “prepare” followed by “run” to start reformatting. Monitor this process in the small panel at the bottom left. 252 +* (% class="box warningmessage" %) 253 +((( 254 +* **Ensure to export data as "COUNTS", not "mV".** 178 178 179 -Use existing field logbook to note time, SN and station name plus any notes – including any issues with orientation or level or anything else 256 +* **Set "Remove Gain" to the same decibel gain as during programming** **(by default ANU sets this to 24db (a factor of 15.848932).** 257 +))) 258 +))) 180 180 260 +==== **Handling Nodes During Download** ==== 181 181 182 -== Charging == 262 +1. ((( 263 +**Monitoring Download Indicators**: 183 183 184 -Clean node prior to charging and harvesting the data 265 +* During download, green lights on nodes will blink, and associated red lights on the rack will flash. 266 +* Disconnect nodes properly before unplugging anything. 267 +* Be cautious: if the laptop enters sleep mode, the download will pause. 268 +))) 269 +1. ((( 270 +//**Investment in Storage Hardware**~:// 185 185 186 -Remove battery (and spike) from the sensor by twisting the spike part of the instrument 272 +* (% class="box warningmessage" %) 273 +((( 274 +* **Use fast external hard drives to avoid limitations in data harvesting.** 187 187 188 -Set 16 nodes into the charging box (spikes up) 276 +* **Recommended specifications: USB-C, USB 3.0, and 4+ Tb of space.** 277 +))) 278 +))) 279 +1. ((( 280 +**Metadata and Time Settings**: 189 189 190 -Red lights on the box next to the batteries will come on and remain a steady red light while charging. This will change to orange, then to green, then to flashing green when fully charged. 282 +* Ensure all metadata is saved with the file. 283 +* System auto-determines the earliest data time as the start time. You can set it a day earlier at 00:00:00 for 24-hour data segments starting from midnight. 284 +))) 285 +1. ((( 286 +**Finalizing the Download**: 191 191 192 - Thisisa goodtimeto check the "C" box on your temporary labels tomark that the unit has beencharged288 +* After downloading, mark the //"D"// box on your temporary labels to indicate completion. 193 193 194 -[[IGU 16-HRcharger (left) and harvester (right)>>image:1705195933422-337.png||data-xwiki-image-style-alignment="center"]] 290 + 291 +))) 195 195 293 +[[image:1706153266647-145.png||data-xwiki-image-style-alignment="center" height="340" width="603"]] 196 196 197 197 198 -== Downloading and Converting Data to MiniSeed == 199 199 297 +[[Caption>>image:1705195543887-977.png||data-xwiki-image-style-alignment="center" height="534" width="632"]] 200 200 201 -The first thing to do is to register the nodes in the system, so the software can recognize them. To do this, go to the folder where the “SmartSoloApps SoloLite” was installed. Then right-click the deviceconfig.exe program to “run as an administrator” and save the file to the directory of “deviceconfig” (snapshot below). Note that to avoid registering the same node twice, you can simply replace the file each time you do the registration. 202 202 203 -[[image:1705195543887-977.png]] 204 204 205 205 206 - Then openthe “SoloLite” software, and just go to “File” tomakea new project.Inthis case, youdo not need to find the exact16 nodes thatwere grouped for script writing. Do not worryabout the settings for theeismic recordings forthenext window to pop up,as the only way to reset theinstruments (e.g., sampling rate,gainetc)istowrite script to re-program them.302 +[[Caption>>image:1705195543890-537.png||data-xwiki-image-style-alignment="center" height="397" width="665"]] 207 207 208 -[[image:1705195543890-537.png||data-xwiki-image-style-alignment="center"]] 209 209 210 210 211 - Once you create the newproject, your Data Transfer View panelonthe bottom right of thewindow will show these nodes that haveproperly connected to the data harvest, includingseries number,datasize etc. It is okayif the “Prospect not matched”, which simply means theproject you justcreated does not match the oneyou made to program them. Simply selectall thesenodes, and rightlick to “forcedownload”, which will initiatethedownloadingprocess. Once theyare done, youwill see new folders created for eachslot at your Downloaded Data panel on the top left of the window.306 +[[Caption>>image:1705195543891-334.png||data-xwiki-image-style-alignment="center" height="379" width="650"]] 212 212 213 -[[image:1705195543891-334.png||data-xwiki-image-style-alignment="center"]] 214 214 215 -At this stage, it means that the raw DLL data of the recording has been downloaded successfully to your local machine. To output data in readable format, such as SAC or miniSEED, click the “Tool” menu and select “export seismic data”. The parameters here should be straightforward to set and tailored to personal reference. 216 216 217 -(% class="box warningmessage" %) 218 -((( 219 -**Please make sure that data is exported as "COUNTS" and NOT "mV"!** 220 -))) 310 +[[image:1705195543898-365.png||data-xwiki-image-style-alignment="center" height="467" width="674"]] 221 221 222 -(% class="box warningmessage" %) 223 -((( 224 -**Furthermore you must also set "Remove Gain" to the same decibel gain setting that was set during programming! ANU always set this to 18 db (double check) for all types of nodes.** 225 -))) 312 +---- 226 226 227 - Alist of ANU group preferred parameters canbe found at the end of this session. One thingto note is that the “Sample Interval” must be set exactly to this used to reset the nodes. Once you are done with the setting, click “prepare” before “run”. If everything works correctly, you should see the reformatting process from the small panel on the bottom left of this popped up window.314 +=== **Cleaning** === 228 228 229 - Now theata should beready.Then you can select these data andrightclick to output the GPSnformationassociatedwith them.316 +**Procedure for Seismic Nodes:** 230 230 231 - [[image:1705195543898-365.png||data-xwiki-image-style-alignment="center"]]318 +* If the nodes are placed in a thick plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us! 232 232 233 -When downloading, all the green lights on the nodes will blink. The associated red lights on the rack will flash when it is downloading, and make sure to disconnect the nodes before you unplug anything. Be careful: if the laptop goes to sleep, the download process will pause. 234 - 235 -(% class="box infomessage" %) 236 -((( 237 -**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING**. USB-C, USB 3.0, and 4+ Tb of space are highly recommended! 320 += = 238 238 ))) 239 239 240 -When downloading, ensure that all metadata is saved along with the file. 241 - 242 -Start and endtime: the system will automatically find the earliest time of the data and set that as the starting time. However, you can set the time a day earlier with a sharp start of 00:00:00. In this case, all the outputted data segments will be 24 hours long starting from midnight. 243 - 244 -//Once downloaded, mark the "D" box on your temporary labels!// 245 - 246 -== Converting data == 247 - 248 -Check the data all have been converted to miniseed correctly 249 - 250 -– 3 files per station per day 251 - 252 -* Files are the same size (NOTE if having memory issues one or more of the components may have 0-1 kb) 253 -* ~~ 5 Gb / node / month 254 - 255 -//Tick ‘R’ box on the node label// 256 - 257 - 258 -== Cleaning == 259 - 260 -If the nodes are placed in a thick plastic bag at the time of installation, the cleaning procedure should be straightforward. If not you have a lot of work to do before they are returned to us! 261 - 262 - 263 -))) 264 - 265 - 266 266 (% class="col-xs-12 col-sm-4" %) 267 267 ((( 268 268 (% class="box" %) ... ... @@ -314,9 +314,9 @@ 314 314 |(% style="width:187px" %)**Frequency Band**|(% style="width:224px" %)5 Hz to 1652Hz 315 315 |(% style="width:187px" %)**Sensitivity**|(% style="width:224px" %)67.7 V/m/s 316 316 |(% style="width:187px" %)**Size (with spike)**|(% style="width:224px" %)103mm(L) × 95mm(W) × 187mm 317 -|(% style="width:187px" %)**Weight**|(% style="width:224px" %)2. 3kg374 +|(% style="width:187px" %)**Weight**|(% style="width:224px" %)2.4 kg 318 318 |(% style="width:187px" %)**Data Storage**|(% style="width:224px" %)64 Gb 319 -|(% style="width:187px" %)**Battery**|(% style="width:224px" %)Li _etcXXAh376 +|(% style="width:187px" %)**Battery**|(% style="width:224px" %)Lithium ion XXAh 320 320 ))) 321 321 322 322
- 1706153266647-145.png
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.sima - Size
-
... ... @@ -1,0 +1,1 @@ 1 +1.7 MB - Content
- 1706153354750-415.png
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.sima - Size
-
... ... @@ -1,0 +1,1 @@ 1 +2.1 MB - Content
- 1706153556166-231.jpeg
-
- Author
-
... ... @@ -1,0 +1,1 @@ 1 +XWiki.sima - Size
-
... ... @@ -1,0 +1,1 @@ 1 +839.4 KB - Content