Changes for page SmartSolo Node Seismometers
Last modified by robert on 2025/08/15 16:30
From version 16.1
edited by Jack Dent
on 2024/01/15 08:56
on 2024/01/15 08:56
Change comment:
There is no comment for this version
To version 24.1
edited by Sima Mousavi
on 2024/01/24 16:27
on 2024/01/24 16:27
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. JackD1 +XWiki.sima - Content
-
... ... @@ -2,6 +2,167 @@ 2 2 ((( 3 3 (% class="col-xs-12 col-sm-8" %) 4 4 ((( 5 += **Node Setup** = 6 + 7 +Short term (~~30 day) battery powered nodes. The default gain should be 24 db for the 16HR-3C and 6 db for the BD3C-5 8 + 9 + 10 +~*~**this needs to be reformatted 11 + 12 +== **Pre-Fieldwork Preparation** == 13 + 14 +(% class="box infomessage" %) 15 +((( 16 +(% class="box warningmessage" %) 17 +((( 18 +**INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING** 19 + 20 +**Plan on 1 Tb to store ALL data for 50 nodes @ 250 Hz and a single ~~30 day occupation** 21 +))) 22 +))) 23 + 24 += **Installation** = 25 + 26 +=== **1- Logbook documentation** === 27 + 28 +((( 29 +**Essential Details**: Record the following in a logbook: 30 + 31 +* Station name 32 +* Latitude and longitude 33 +* Names of team members present 34 +* Date and local time of installation 35 +* Serial number (SN) of the sensor 36 +* Detailed notes on the site conditions and setup 37 + 38 +=== **2- Node Placement** === 39 +))) 40 + 41 +**Protection**: Place nodes inside thick, landfill biodegradable plastic bags for environmental protection. 42 + 43 +**Site Analysis**: 44 + 45 +* Conduct compass measurements away from the node and metallic structures, adjusting for inclination angle. 46 +* Take multiple photographs from various angles to document the site setup thoroughly. 47 +* Include a detailed site description in your notes, specifying distances and orientations from nearby landmarks (e.g. Richards garden, Te Mini steam field eastern side) 48 + 49 +=== **3- GPS Considerations** === 50 + 51 +(% class="wikigeneratedid" %) 52 +The GPS antenna is at the top and center of the unit, and will (usually) only receive signal with a clear sky view directly above. The signal is able to penetrate plastic and terracotta planters and a thin layer of soil, but may struggle if the soil layer is too thick. The BD3C will not start recording without first attaining a GPS lock. 53 + 54 +=== **4- Visibility and Location Marking** === 55 + 56 +**Flag Placement**: Position a flag, preferably in a bright color (avoid green or yellow), near the instrument to aid in its future location. 57 + 58 +**GPS Marking**: 59 + 60 +* Use a GPS device to mark the instrument's exact location. 61 +* Record this location in both your paper notes and the GPS device. 62 + 63 +=== (% style="color:inherit; font-family:inherit; font-size:max(18px, min(20px, 14.4444px + 0.462963vw))" %)**5- Charge Time, Pre-Deployment & Post-Deployment**(%%) === 64 + 65 +* **Charging Duration**: Both types of nodes take approximately 6-8 hours to fully charge from a flat state. 66 +* **Pre-Deployment Charging**: 67 +** Although the nodes hold their charge well, it's beneficial to give them a "top up" charge right before deployment. 68 + 69 +* **Operational Duration**: 70 +** When recording at 250 Hz, with GPS on and Bluetooth disabled, the instruments are expected to last about 30 days per charge cycle. 71 + 72 +* **Post-Retrieval Charging**: 73 +** Do not store the instruments with completely drained batteries. 74 +** After retrieval, charge the instruments to about 50-60% (indicated as "orange" level) for optimal battery health. 75 + 76 +* **Storage and Shipping Charge Level**: 77 +** Maintain a battery charge level of around 50-60% for both storage and shipping purposes. 78 +** This charge level is recommended to prevent battery damage and is safe for transportation. 79 + 80 +=== === 81 + 82 +=== **6- Data Sharing and Metadata Creation** === 83 + 84 +**GPS Data**: 85 + 86 +* Download the GPS file to a laptop. 87 +* Share this file on a drive accessible to all team members for uniform understanding of node locations. 88 + 89 +**Photo Sharing**: 90 + 91 +* Upload site photos to a shared platform (OneDrive, Dropbox, etc.). 92 +* Integrating photos into Google Maps or Google Earth can be particularly beneficial for easy location referencing. 93 + 94 +**Metadata File**: 95 + 96 +* Create a metadata XML file for each node, which is essential for data organisation and future reference. 97 + 98 +=== **7- Additional Best Practices** === 99 + 100 +* **Environmental Responsibility**: Ensure that the node placement and the materials used are environmentally responsible and adhere to local regulations. 101 +* **Training and Familiarisation**: Make sure all team members are adequately trained in using the GPS devices, compass, and other equipment to ensure consistent and accurate data collection. 102 + 103 +* ((( 104 +==== **Keeping the Instruments Clean** ==== 105 +))) 106 +* ((( 107 +Use a (**landfill**, not //compost//) degradable bag when installing to keep the instrument clean. This will save you many hours of time cleaning them in preparation for their return. [[Here is a video>>url:http://auspass.edu.au/field/bd3c_removal.mp4]] demonstrating its effectiveness. 108 +))) 109 + 110 += = 111 + 112 +=== **Seismic Station Demobilization and Documentation** === 113 + 114 +1. ((( 115 +**Preparation for Demobilization**: 116 + 117 +* Before starting the demobilization process, ensure you have a compass, tape, marker, pen, clipboard, logbook, and compass ready in your tote bag. 118 +))) 119 +1. ((( 120 +**Locating the instrument**: 121 + 122 +* Use the downloaded GPS file to accurately locate the node for demobilization. 123 +* Import this KMZ file onto your phone for easy reference and location tracking. 124 +* Utilize Google Maps or Google Earth to create a KMZ file of the station’s location. 125 +))) 126 +1. ((( 127 +**Labeling Instruments for Demobilization**: 128 + 129 +* Write the station name and the instrument’s serial number on a label. 130 +* Add markers 'D' (for download), 'C' (for charge), and ‘R’ (for removal) next to checkboxes on the label. 131 +* Affix this label to the top of the instrument to avoid confusion during the charging and downloading data. 132 +))) 133 +1. ((( 134 +**Photographing the Setup Node**: 135 + 136 +* Take a photo of the entire setup node with the __//label//__ and __//compass visible//__. 137 +* This photo serves as a final record of the instrument’s condition and orientation at the time of removal. 138 +))) 139 +1. ((( 140 +**Logging Demobilization Details**: 141 + 142 +* Use the field logbook to note the time of demobilization, serial numbers, and station name. 143 +* Record any observations or issues related to the instrument’s orientation, level, or any other relevant factors. 144 +))) 145 +1. ((( 146 +**Final Checks and Equipment Removal**: 147 + 148 +* Before physically removing the instrument, double-check that all necessary data has been downloaded and all photos and notes have been taken. 149 +* Carefully dismantle and pack the equipment, ensuring that all components are accounted for and securely stored for transport. 150 +))) 151 + 152 + 153 + 154 + 155 + 156 + 157 + 158 + 159 + 160 + 161 + 162 + 163 + 164 + 165 + 5 5 = SmartSolo IGU 16HR 3C (5 Hz) Short Period Node = 6 6 7 7 blahblah