Sima Mousavi 3.1 1 = **Seismic Station Setup** =
robert 1.1 2
Sima Mousavi 2.1 3 Conducting field work for a seismic station setup involves a series of meticulous steps and considerations to ensure accurate and reliable seismic data collection. 
4 \\Long term solar powered stations
robert 1.3 5
robert 1.1 6 (% class="row" %)
7 (((
8 (% class="col-xs-12 col-sm-8" %)
9 (((
Sima Mousavi 2.1 10 == **Site selection and preparation** ==
robert 1.1 11
Sima Mousavi 3.1 12 * (((
13 Choose a location with minimal noise interference and away from urban areas, traffic, and industrial activities.
14 )))
Sima Mousavi 2.1 15 * The site should be geologically stable and representative of the area's seismic characteristics.
16 * Accessibility and security of the site are also important factors.
17 * Conduct a detailed survey of the site, including topographical, geological, and geophysical assessments.
18 * Prepare the site by clearing vegetation, leveling the ground
robert 1.1 19
Sima Mousavi 3.1 20 == **Installing seismic sensors** ==
robert 1.1 21
Sima Mousavi 3.1 22 * Bury seismometers at an appropriate depth for noise reduction and stable ground coupling.
23 * Orient the sensors correctly using a compass, paying special attention to the north direction. When using a compass to orient the sensors, ensure it is kept away from metal objects or structures that could interfere with its magnetic field. Accurately determine the north direction for precise sensor orientation.
robert 1.1 24
Sima Mousavi 4.1 25 == **Setting up data**: ==
robert 1.1 26
Sima Mousavi 3.1 27 * Install data loggers or recorders compatible with the sensors.
28 * Ensure adequate storage capacity and configuration for the desired sampling rate and data format.
Sima Mousavi 4.1 29 * Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the south hemisphere for optimal sunlight exposure.
Sima Mousavi 6.1 30 * Set up a GPS antenna to provide accurate time synchronization for the seismic data
31 * Ensure the GPS antenna has a clear view of the sky for optimal signal reception.
Sima Mousavi 4.1 32 * Calibrate sensors and data acquisition systems for accuracy.
33 * Test for sensitivity, noise levels, and overall performance.
robert 1.1 34
Sima Mousavi 5.2 35 == **Fire safety measures and documentation in seismic station installation** ==
robert 1.1 36
Sima Mousavi 4.1 37 * In bushfire-prone areas, clear a wide perimeter around the installation to reduce fire risk.
38 * Use fireproof blankets to cover equipment, providing an additional layer of protection against fire damage.
Sima Mousavi 5.2 39 * Install a metal net over the entire setup to shield it from external elements
Sima Mousavi 4.1 40
41 * Document the installation process, including sensor types, orientations, locations, and system configurations, along with fire safety measures implemented.
42 * Record essential metadata for seismic data interpretation.
43
Sima Mousavi 6.1 44 = **Node Setup** =
robert 1.1 45
robert 1.3 46 Short term (~~30 day) battery powered nodes
robert 1.1 47
Sima Mousavi 6.3 48 === **Pre-Fieldwork Preparation** ===
robert 1.1 49
Sima Mousavi 6.3 50 * (((
51 INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING
52 )))
robert 1.1 53
Sima Mousavi 6.3 54 === **Installation** ===
Sima Mousavi 6.2 55
Sima Mousavi 6.3 56 * **Logbook Maintenance**: Document essential details:
57 ** Station name, latitude/longitude, team members, date/time.
58 ** Serial number (SN) of sensor, site notes.
59 * **Node Placement**: Use biodegradable plastic bags for node protection.
60 * **Orientation and Site Description**:
61 ** Compass measurements (adjust for inclination).
62 ** Detailed description of the site, including landmarks.
63 * **Visibility and GPS Marking**:
64 ** Use distinctively colored flags for easy location.
65 ** Mark location with GPS; record in logbook and device.
66 * **Photo Documentation**: Take multiple photos from various angles.
67
robert 1.1 68 == Sub-paragraph ==
69
70 abc
71 )))
72
73
74 (% class="col-xs-12 col-sm-4" %)
75 (((
76 {{box title="**Contents**"}}
77 {{toc/}}
78 {{/box}}
79
robert 1.4 80 [[image:station_example.png||alt="example long term station setup" data-xwiki-image-style-alignment="center"]]//Figure 1: Typical station setup (LPR-200 & 10w solar panel)//
robert 1.1 81
robert 1.4 82 [[image:20230925_122808.jpg||alt="working on a site" data-xwiki-image-style-alignment="center" height="467" width="350"]]
83 //Figure 2: Flipping up the back of the fence onto the support picket to work comfortably//
robert 1.1 84 )))
85 )))
Sima Mousavi 4.1 86
87 [[**Fireproof blanket**
88 size: 1x1 m2>>image:20240116_125547.jpg||alt="Fire blanket" height="380" width="350"]]