Wiki source code of Field Guides & Best Practices

Version 15.1 by Jack Dent on 2024/12/19 10:10

Hide last authors
Sima Mousavi 3.1 1 = **Seismic Station Setup** =
robert 1.1 2
Jack Dent 9.1 3 Conducting fieldwork for a seismic station setup involves a series of meticulous steps and considerations to ensure accurate and reliable seismic data collection. 
robert 11.1 4
robert 1.3 5
robert 1.1 6 (% class="row" %)
7 (((
8 (% class="col-xs-12 col-sm-8" %)
9 (((
robert 10.2 10 = **Site selection and preparation** =
robert 1.1 11
Sima Mousavi 3.1 12 * (((
13 Choose a location with minimal noise interference and away from urban areas, traffic, and industrial activities.
14 )))
Sima Mousavi 2.1 15 * The site should be geologically stable and representative of the area's seismic characteristics.
16 * Accessibility and security of the site are also important factors.
17 * Conduct a detailed survey of the site, including topographical, geological, and geophysical assessments.
Jack Dent 14.1 18 * Prepare the site by clearing vegetation and leveling the ground.
robert 1.1 19
robert 10.2 20 = **Installing Sensors** =
robert 1.1 21
Jack Dent 14.1 22 * Bury seismometers at an appropriate depth for noise reduction and stable ground coupling, typically 0.5-0.8 metre depth.
Sima Mousavi 3.1 23 * Orient the sensors correctly using a compass, paying special attention to the north direction. When using a compass to orient the sensors, ensure it is kept away from metal objects or structures that could interfere with its magnetic field. Accurately determine the north direction for precise sensor orientation.
Jack Dent 14.1 24 * Ensure the sensor is leveled correctly. A paver or concrete slab can be used to allow for more accurate leveling.
25 * It is recommended that the following sensors be installed with a PVC tube covering to prevent corrosion and other environmental degradation:
26 ** TC-120
27 ** TC-20
28 **
29 * Hold the sensor or sensor covering securely while infilling and packing the hole to ensure the sensor is kept level.
robert 1.1 30
robert 10.2 31 = **Setting up Data Logger** =
robert 1.1 32
Sima Mousavi 3.1 33 * Install data loggers or recorders compatible with the sensors.
Jack Dent 13.1 34 * Ensure adequate storage capacity and configuration for the desired sampling rate and data format. Generally:
35
36 64Gb card: 245 days @ 250hz or 610 days @ 100hz
37
38 32Gb card: 122 days @ 250hz or 305 days @ 100hz
39
Sima Mousavi 4.1 40 * Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the south hemisphere for optimal sunlight exposure.
Jack Dent 15.1 41 * Set up a GPS antenna to provide accurate time synchronization for the seismic data.
Sima Mousavi 6.1 42 * Ensure the GPS antenna has a clear view of the sky for optimal signal reception.
Sima Mousavi 4.1 43 * Calibrate sensors and data acquisition systems for accuracy.
44 * Test for sensitivity, noise levels, and overall performance.
robert 1.1 45
robert 10.2 46 = **Fire safety measures and documentation in seismic station installation** =
robert 1.1 47
Sima Mousavi 4.1 48 * In bushfire-prone areas, clear a wide perimeter around the installation to reduce fire risk.
49 * Use fireproof blankets to cover equipment, providing an additional layer of protection against fire damage.
Sima Mousavi 5.2 50 * Install a metal net over the entire setup to shield it from external elements
Sima Mousavi 4.1 51
52 * Document the installation process, including sensor types, orientations, locations, and system configurations, along with fire safety measures implemented.
53 * Record essential metadata for seismic data interpretation.
54
robert 10.2 55 = **Step-by-step field installation guide (with images)** =
robert 1.1 56
Jack Dent 9.1 57
58 (% border="0" cellpadding="0" cellspacing="0" style="width:800px" %)
59 |(% style="width:192px" %)(((
60 [[image:1715740852278-219.jpg||height="185" width="185"]]
61
Jack Dent 14.1 62 (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)1. Dig a hole roughly 80cm deep and wide enough to place a paver in.
Jack Dent 9.1 63 )))|(% style="width:191px" %)[[image:1715740856792-247.jpg||height="181" width="181"]](((
Jack Dent 10.1 64 (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)2. Level the bottom of the hole. A paver or brick can be used to create a flat base for the device. Draw a line on the paver, orient it towards North and level it.
Jack Dent 9.1 65 )))|(% style="width:191px" %)(((
66 [[image:1715740874992-904.jpg||height="179" width="179"]]
67
Jack Dent 10.1 68 (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)3. Place the seismometer on the paver and ensure it is levelled and oriented (remember to account for the declination in your area).
Jack Dent 9.1 69 )))
70 |(% style="width:192px" %)(((
Jack Dent 15.1 71 [[image:1715740934594-394.jpg||height="203" width="203"]]
Jack Dent 9.1 72
Jack Dent 10.1 73 (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)4. Depending on the model of the seismometer, place a protective PVC tub over it.
Jack Dent 9.1 74 )))|(% style="width:191px" %)(((
Jack Dent 15.1 75 [[image:1715741200573-382.jpg||height="203" width="102"]][[image:1715741200573-909.jpg||height="202" width="102"]]
Jack Dent 9.1 76
robert 10.2 77 (% style="color:#000000; font-family:Arial,sans-serif; font-size:14.6667px; white-space-collapse:preserve" %)5. Fill in the hole whilst stabilising the sensor and packing the dirt firmly.
Jack Dent 9.1 78 )))|(% style="width:191px" %)(((
79 [[image:1715741278653-711.jpg||height="189" width="189"]]
80
Jack Dent 10.1 81 (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)6. Once the hole is filled and levelled, drive a stake (star pickets work well) into the ground next to the seismometer, and fit the wire panels over it, driving pegs into the north-facing side.
Jack Dent 9.1 82 )))
83 |(% style="width:192px" %)(((
Jack Dent 15.1 84 [[image:1715742260851-696.jpg||height="220" width="220"]]
Jack Dent 9.1 85
Jack Dent 10.1 86 (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)7. Attach the solar panel to this side, and the GPS to the stake (wrap the wire around the stake once or twice so it stays in position if it is detached).
Jack Dent 9.1 87 )))|(% style="width:191px" %)(((
Jack Dent 15.1 88 [[image:1715741876857-916.jpg||height="218" width="218"]]
Jack Dent 9.1 89
Jack Dent 15.1 90 8. (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)Connect the seismometer, solar panel, and GPS to the logger and turn the logger on. See "setting up data logger" and "ANU seismic data loggers" page for more details. Set the logger to record and ensure it starts recording.
Jack Dent 9.1 91 )))|(% style="width:191px" %)(((
Jack Dent 15.1 92 [[image:IMG_0667.jpg||height="218" width="218"]]
Jack Dent 9.1 93
Jack Dent 10.1 94 9. (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)Cover the logger with a fire blanket, starting by placing it on the top, so the opening is underneath the logger.
Jack Dent 9.1 95 )))
96 |(% style="width:192px" %)(((
97 [[image:1715742037353-873.jpg||height="189" width="189"]]
98
Jack Dent 10.1 99 10. (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)Once all the sides of the blanket are tucked under the logger, cover the logger with rocks or dirt.
Jack Dent 9.1 100 )))|(% style="width:191px" %)(((
Jack Dent 15.1 101 [[image:1715742099260-834.jpg||height="187" width="187"]]
Jack Dent 9.1 102
Jack Dent 12.1 103 11. (% style="color:#000000; font-family:Arial,sans-serif; font-size:11pt; font-style:normal; font-variant:normal; font-weight:400; text-decoration:none; white-space:pre-wrap" %)Fold the other metal grating panel over and peg it into the ground. If the ground is too hard, a wire can be used to fix the metal grates to each other. This will also help reduce noise from the rattle of the cage prevent animals from getting to the logger.
Jack Dent 9.1 104 )))|(% style="width:191px" %)(((
105 [[image:1715742149920-412.jpg||height="186" width="186"]]
106
Jack Dent 10.1 107 12. A completed site. Rocks and sticks can also be piled on the ends of the cage if there is a risk of animals tampering in the area.
Jack Dent 9.1 108 )))
109
Sima Mousavi 7.2 110
Sima Mousavi 6.3 111 )))
robert 1.1 112
Sima Mousavi 6.2 113
robert 1.1 114 (% class="col-xs-12 col-sm-4" %)
115 (((
116 {{box title="**Contents**"}}
117 {{toc/}}
118 {{/box}}
119
robert 1.4 120 [[image:station_example.png||alt="example long term station setup" data-xwiki-image-style-alignment="center"]]//Figure 1: Typical station setup (LPR-200 & 10w solar panel)//
robert 1.1 121
robert 1.4 122 [[image:20230925_122808.jpg||alt="working on a site" data-xwiki-image-style-alignment="center" height="467" width="350"]]
123 //Figure 2: Flipping up the back of the fence onto the support picket to work comfortably//
Sima Mousavi 4.1 124
125 [[**Fireproof blanket**
126
Sima Mousavi 7.2 127 size: 1x1 m2>>image:20240116_125547.jpg||data-xwiki-image-style-alignment="center"]]
128
129
130 )))
131 )))