Changes for page Field Deployment Guides
Last modified by KB on 2025/08/12 12:18
From version 6.2
edited by Sima Mousavi
on 2024/01/16 13:46
on 2024/01/16 13:46
Change comment:
There is no comment for this version
To version 5.2
edited by Sima Mousavi
on 2024/01/16 13:30
on 2024/01/16 13:30
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -27,8 +27,6 @@ 27 27 * Install data loggers or recorders compatible with the sensors. 28 28 * Ensure adequate storage capacity and configuration for the desired sampling rate and data format. 29 29 * Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the south hemisphere for optimal sunlight exposure. 30 -* Set up a GPS antenna to provide accurate time synchronization for the seismic data 31 -* Ensure the GPS antenna has a clear view of the sky for optimal signal reception. 32 32 * Calibrate sensors and data acquisition systems for accuracy. 33 33 * Test for sensitivity, noise levels, and overall performance. 34 34 ... ... @@ -41,15 +41,14 @@ 41 41 * Document the installation process, including sensor types, orientations, locations, and system configurations, along with fire safety measures implemented. 42 42 * Record essential metadata for seismic data interpretation. 43 43 44 -= **Node Setup**=42 += Node Setup = 45 45 46 46 Short term (~~30 day) battery powered nodes 47 47 48 -== =1. Pre-Fieldwork Preparation===46 +== Sub-paragraph == 49 49 50 - * INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING48 +abc 51 51 52 - 53 53 == Sub-paragraph == 54 54 55 55 abc