Changes for page Field Deployment Guides

Last modified by KB on 2025/08/12 12:18

From version 4.2
edited by Sima Mousavi
on 2024/01/16 13:23
Change comment: There is no comment for this version
To version 6.1
edited by Sima Mousavi
on 2024/01/16 13:39
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -27,18 +27,21 @@
27 27  * Install data loggers or recorders compatible with the sensors.
28 28  * Ensure adequate storage capacity and configuration for the desired sampling rate and data format.
29 29  * Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the south hemisphere for optimal sunlight exposure.
30 +* Set up a GPS antenna to provide accurate time synchronization for the seismic data
31 +* Ensure the GPS antenna has a clear view of the sky for optimal signal reception.
30 30  * Calibrate sensors and data acquisition systems for accuracy.
31 31  * Test for sensitivity, noise levels, and overall performance.
32 32  
33 -== **Fire safety measures and documentation in seismic station installation** ==
35 +== **Fire safety measures and documentation in seismic station installation** ==
34 34  
35 35  * In bushfire-prone areas, clear a wide perimeter around the installation to reduce fire risk.
36 36  * Use fireproof blankets to cover equipment, providing an additional layer of protection against fire damage.
39 +* Install a metal net over the entire setup to shield it from external elements
37 37  
38 38  * Document the installation process, including sensor types, orientations, locations, and system configurations, along with fire safety measures implemented.
39 39  * Record essential metadata for seismic data interpretation.
40 40  
41 -= Node Setup =
44 += **Node Setup** =
42 42  
43 43  Short term (~~30 day) battery powered nodes
44 44