27 27  * Install data loggers or recorders compatible with the sensors.
28 28  * Ensure adequate storage capacity and configuration for the desired sampling rate and data format.
29 29  * Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the south hemisphere for optimal sunlight exposure.
30 +* Set up a GPS antenna to provide accurate time synchronization for the seismic data
31 +* Ensure the GPS antenna has a clear view of the sky for optimal signal reception.
30 30  * Calibrate sensors and data acquisition systems for accuracy.
31 31  * Test for sensitivity, noise levels, and overall performance.
32 32  
35 +== **Fire safety measures and documentation in seismic station installation** ==
33 33  
34 34  * In bushfire-prone areas, clear a wide perimeter around the installation to reduce fire risk.
35 35  * Use fireproof blankets to cover equipment, providing an additional layer of protection against fire damage.
39 +* Install a metal net over the entire setup to shield it from external elements
36 36  
37 37  * Document the installation process, including sensor types, orientations, locations, and system configurations, along with fire safety measures implemented.
38 38  * Record essential metadata for seismic data interpretation.
39 39  
40 -= Node Setup =
44 += **Node Setup** =
41 41  
42 42  Short term (~~30 day) battery powered nodes
43 43  
44 -== Sub-paragraph ==
48 +=== 1. Pre-Fieldwork Preparation ===
45 45  
46 -abc
50 +* INVEST IN FAST EXTERNAL HARD DRIVES – DO NOT LET THIS BE THE LIMITATION OF DATA HARVESTING
47 47  
52 +
48 48  == Sub-paragraph ==
49 49  
50 50  abc