Changes for page Field Deployment Guides
Last modified by KB on 2025/08/12 12:18
From version 3.1
edited by Sima Mousavi
on 2024/01/16 13:05
on 2024/01/16 13:05
Change comment:
There is no comment for this version
To version 4.1
edited by Sima Mousavi
on 2024/01/16 13:19
on 2024/01/16 13:19
Change comment:
There is no comment for this version
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -10,8 +10,6 @@ 10 10 == **Site selection and preparation** == 11 11 12 12 * ((( 13 -[[Size 1x1 m2>>image:20240116_125547.jpg||alt="Fire blanket, size 1m2"]] 14 - 15 15 Choose a location with minimal noise interference and away from urban areas, traffic, and industrial activities. 16 16 ))) 17 17 * The site should be geologically stable and representative of the area's seismic characteristics. ... ... @@ -24,12 +24,21 @@ 24 24 * Bury seismometers at an appropriate depth for noise reduction and stable ground coupling. 25 25 * Orient the sensors correctly using a compass, paying special attention to the north direction. When using a compass to orient the sensors, ensure it is kept away from metal objects or structures that could interfere with its magnetic field. Accurately determine the north direction for precise sensor orientation. 26 26 27 -== **Setting up data acquisition systems**: ==25 +== **Setting up data**: == 28 28 29 29 * Install data loggers or recorders compatible with the sensors. 30 30 * Ensure adequate storage capacity and configuration for the desired sampling rate and data format. 29 +* Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the south hemisphere for optimal sunlight exposure. 30 +* Calibrate sensors and data acquisition systems for accuracy. 31 +* Test for sensitivity, noise levels, and overall performance. 31 31 32 32 34 +* In bushfire-prone areas, clear a wide perimeter around the installation to reduce fire risk. 35 +* Use fireproof blankets to cover equipment, providing an additional layer of protection against fire damage. 36 + 37 +* Document the installation process, including sensor types, orientations, locations, and system configurations, along with fire safety measures implemented. 38 +* Record essential metadata for seismic data interpretation. 39 + 33 33 = Node Setup = 34 34 35 35 Short term (~~30 day) battery powered nodes ... ... @@ -56,3 +56,8 @@ 56 56 //Figure 2: Flipping up the back of the fence onto the support picket to work comfortably// 57 57 ))) 58 58 ))) 66 + 67 +[[**Fireproof blanket** 68 +size: 1x1 m2>>image:20240116_125547.jpg||alt="Fire blanket" height="380" width="350"]] 69 + 70 +