Changes for page Field Deployment Guides
Last modified by KB on 2025/08/12 12:18
From version 3.1
edited by Sima Mousavi
on 2024/01/16 13:05
on 2024/01/16 13:05
Change comment:
There is no comment for this version
Summary
-
Page properties (2 modified, 0 added, 0 removed)
-
Attachments (0 modified, 0 added, 1 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. sima1 +XWiki.robert - Content
-
... ... @@ -1,35 +1,26 @@ 1 - =**Seismic Station Setup** =1 + 2 2 3 -Conducting field work for a seismic station setup involves a series of meticulous steps and considerations to ensure accurate and reliable seismic data collection. 4 -\\Long term solar powered stations 3 += Seismic Station Setup = 5 5 5 +Long term solar powered stations 6 + 6 6 (% class="row" %) 7 7 ((( 8 8 (% class="col-xs-12 col-sm-8" %) 9 9 ((( 10 -== **Site selection andpreparation**==11 +== Sub-paragraph == 11 11 12 -* ((( 13 -[[Size 1x1 m2>>image:20240116_125547.jpg||alt="Fire blanket, size 1m2"]] 13 +xyz 14 14 15 -Choose a location with minimal noise interference and away from urban areas, traffic, and industrial activities. 16 -))) 17 -* The site should be geologically stable and representative of the area's seismic characteristics. 18 -* Accessibility and security of the site are also important factors. 19 -* Conduct a detailed survey of the site, including topographical, geological, and geophysical assessments. 20 -* Prepare the site by clearing vegetation, leveling the ground 15 +== Sub-paragraph == 21 21 22 - == **Installing seismic sensors** ==17 +xyz 23 23 24 -* Bury seismometers at an appropriate depth for noise reduction and stable ground coupling. 25 -* Orient the sensors correctly using a compass, paying special attention to the north direction. When using a compass to orient the sensors, ensure it is kept away from metal objects or structures that could interfere with its magnetic field. Accurately determine the north direction for precise sensor orientation. 19 +=== Sub-sub paragraph === 26 26 27 - == **Setting up data acquisition systems**: ==21 +xyz 28 28 29 -* Install data loggers or recorders compatible with the sensors. 30 -* Ensure adequate storage capacity and configuration for the desired sampling rate and data format. 31 31 32 - 33 33 = Node Setup = 34 34 35 35 Short term (~~30 day) battery powered nodes
- 20240116_125547.jpg
-
- Author
-
... ... @@ -1,1 +1,0 @@ 1 -XWiki.sima - Size
-
... ... @@ -1,1 +1,0 @@ 1 -340.5 KB - Content