Changes for page Field Deployment Guides

Last modified by KB on 2025/08/12 12:18

From version 3.1
edited by Sima Mousavi
on 2024/01/16 13:05
Change comment: There is no comment for this version
To version 1.4
edited by robert
on 2023/12/12 12:50
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.sima
1 +XWiki.robert
Content
... ... @@ -1,35 +1,26 @@
1 -= **Seismic Station Setup** =
1 +
2 2  
3 -Conducting field work for a seismic station setup involves a series of meticulous steps and considerations to ensure accurate and reliable seismic data collection. 
4 -\\Long term solar powered stations
3 += Seismic Station Setup =
5 5  
5 +Long term solar powered stations
6 +
6 6  (% class="row" %)
7 7  (((
8 8  (% class="col-xs-12 col-sm-8" %)
9 9  (((
10 -== **Site selection and preparation** ==
11 +== Sub-paragraph ==
11 11  
12 -* (((
13 -[[Size 1x1 m2>>image:20240116_125547.jpg||alt="Fire blanket, size 1m2"]]
13 +xyz
14 14  
15 -Choose a location with minimal noise interference and away from urban areas, traffic, and industrial activities.
16 -)))
17 -* The site should be geologically stable and representative of the area's seismic characteristics.
18 -* Accessibility and security of the site are also important factors.
19 -* Conduct a detailed survey of the site, including topographical, geological, and geophysical assessments.
20 -* Prepare the site by clearing vegetation, leveling the ground
15 +== Sub-paragraph ==
21 21  
22 -== **Installing seismic sensors** ==
17 +xyz
23 23  
24 -* Bury seismometers at an appropriate depth for noise reduction and stable ground coupling.
25 -* Orient the sensors correctly using a compass, paying special attention to the north direction. When using a compass to orient the sensors, ensure it is kept away from metal objects or structures that could interfere with its magnetic field. Accurately determine the north direction for precise sensor orientation.
19 +=== Sub-sub paragraph ===
26 26  
27 -== **Setting up data acquisition systems**: ==
21 +xyz
28 28  
29 -* Install data loggers or recorders compatible with the sensors.
30 -* Ensure adequate storage capacity and configuration for the desired sampling rate and data format.
31 31  
32 -
33 33  = Node Setup =
34 34  
35 35  Short term (~~30 day) battery powered nodes
20240116_125547.jpg
Author
... ... @@ -1,1 +1,0 @@
1 -XWiki.sima
Size
... ... @@ -1,1 +1,0 @@
1 -340.5 KB
Content