Changes for page Field Deployment Guides
Last modified by KB on 2025/08/12 12:18
Summary
-
Page properties (2 modified, 0 added, 0 removed)
Details
- Page properties
-
- Author
-
... ... @@ -1,1 +1,1 @@ 1 -XWiki. JackD1 +XWiki.robert - Content
-
... ... @@ -16,7 +16,6 @@ 16 16 * Accessibility and security of the site are also important factors. 17 17 * Conduct a detailed survey of the site, including topographical, geological, and geophysical assessments. 18 18 * Prepare the site by clearing vegetation and levelling the ground. 19 -* A complete site with two metal panels will have dimensions of roughly 50cm high (not including the star picket or stake), 75cm deep (between the bases of the panels) and 92cm wide (the width of one panel). 20 20 21 21 = **Installing Sensors** = 22 22 ... ... @@ -60,7 +60,7 @@ 60 60 61 61 (% class="box errormessage" %) 62 62 ((( 63 -DO NOT bury the sensors usinganything other thanthesupplied ANUPVC housingtube,oradirect burial. Other methods may damage the equipment more than protect it.In particular, burying a sensor in a plastic bag (no matter how well you think you've sealed it) will trap water inside and cause exponentially more damage than a simple direct burial.62 +DO NOT: bury the sensors with anything other than a PVC housing or direct burial. Other methods may damage the equipment more than protect it. 64 64 ))) 65 65 66 66 = **Step-by-step field installation guide (with images)** =