Changes for page Field Deployment Guides

Last modified by KB on 2025/08/12 12:18

From version 22.1
edited by Jack Dent
on 2025/02/04 14:50
Change comment: There is no comment for this version
To version 21.1
edited by robert
on 2025/02/03 16:33
Change comment: There is no comment for this version

Summary

Details

Page properties
Author
... ... @@ -1,1 +1,1 @@
1 -XWiki.JackD
1 +XWiki.robert
Content
... ... @@ -16,7 +16,6 @@
16 16  * Accessibility and security of the site are also important factors.
17 17  * Conduct a detailed survey of the site, including topographical, geological, and geophysical assessments.
18 18  * Prepare the site by clearing vegetation and levelling the ground.
19 -* A complete site with two metal panels will have dimensions of roughly 50cm high (not including the star picket or stake), 75cm deep (between the bases of the panels) and 92cm wide (the width of one panel).
20 20  
21 21  = **Installing Sensors** =
22 22