Changes for page Field Deployment Guides

Last modified by KB on 2025/08/12 12:18

From version 17.1
edited by Jack Dent
on 2025/01/02 10:36
Change comment: There is no comment for this version
To version 19.1
edited by Jack Dent
on 2025/01/06 08:11
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -37,11 +37,12 @@
37 37  
38 38  32Gb card: 122 days @ 250hz or 305 days @ 100hz
39 39  
40 -* Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the south hemisphere for optimal sunlight exposure.
40 +* Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the southern hemisphere for optimal sunlight exposure.
41 41  * Set up a GPS antenna to provide accurate time synchronization for the seismic data.
42 42  * Ensure the GPS antenna has a clear view of the sky for optimal signal reception.
43 43  * Calibrate sensors and data acquisition systems for accuracy.
44 44  * Test for sensitivity, noise levels, and overall performance.
45 +* More information for logger setup can be found on the 'ANU Seismic Data Loggers' information page.
45 45  
46 46  = **Fire safety measures and documentation in seismic station installation** =
47 47