Changes for page Field Deployment Guides
Last modified by KB on 2025/08/12 12:18
Summary
-
Page properties (1 modified, 0 added, 0 removed)
Details
- Page properties
-
- Content
-
... ... @@ -19,18 +19,13 @@ 19 19 20 20 = **Installing Sensors** = 21 21 22 -* Bury seismometers at an appropriate depth for noise reduction and stable ground coupling , typically 0.7 - 1 metre depth.22 +* Bury seismometers at an appropriate depth for noise reduction and stable ground coupling. 23 23 * Orient the sensors correctly using a compass, paying special attention to the north direction. When using a compass to orient the sensors, ensure it is kept away from metal objects or structures that could interfere with its magnetic field. Accurately determine the north direction for precise sensor orientation. 24 24 25 25 = **Setting up Data Logger** = 26 26 27 27 * Install data loggers or recorders compatible with the sensors. 28 -* Ensure adequate storage capacity and configuration for the desired sampling rate and data format. Generally: 29 - 30 -64Gb card: 245 days @ 250hz or 610 days @ 100hz 31 - 32 -32Gb card: 122 days @ 250hz or 305 days @ 100hz 33 - 28 +* Ensure adequate storage capacity and configuration for the desired sampling rate and data format. 34 34 * Establish a reliable power source, such as solar panels, batteries, or local grid connection. Use a compass to align solar panels facing north in the south hemisphere for optimal sunlight exposure. 35 35 * Set up a GPS antenna to provide accurate time synchronization for the seismic data 36 36 * Ensure the GPS antenna has a clear view of the sky for optimal signal reception.