Changes for page ANU Seismic Data Loggers

Last modified by Jack Dent on 2026/06/03 09:42

From version 74.1
edited by Jack Dent
on 2026/06/03 09:41
Change comment: There is no comment for this version
To version 75.1
edited by Jack Dent
on 2026/06/03 09:42
Change comment: There is no comment for this version

Summary

Details

Page properties
Content
... ... @@ -20,7 +20,7 @@
20 20  
21 21  Measurements of a 20 Watt panel in the Canberra (Aus) area show that in full sun, roughly 0.75 amps are put out. As the LPR-200 and TSAWR loggers step down the solar voltage to 12v, a 20 Watt solar panel realistically provides 9 Watts to a seismic station. Theoretically, 1 hour and 9 minutes of sun per day should keep the battery charge stable. However, in practice, 1 hour and 30 minutes of full sunlight for a 20 Watt solar panel is required to keep these stations at a stable charge (this was tested over a 5 day period under Canberra sun in spring)
22 22  
23 -**Note**: It is important to understand 2 main limitations of the solar component of these seismic stations. First, the voltage output of most solar panels will drop significantly if even a small portion of the panel is shaded. This is why 'full' sun is a requirement. Second, 1 hour and 30 minutes of full sun per day will not always be achieved. The sunniest possible location for a seismic station is always ideal.
23 +**Note**: It is important to understand 2 main limitations of the solar component of these seismic stations. First, the voltage output of most solar panels will drop significantly if even a small portion of the panel is shaded. This is why 'full' sun is a requirement. Second, 1 hour and 30 minutes of full sun per day will not reliably be achieved each day. Thus, the sunniest possible location for a seismic station is always ideal.
24 24  
25 25  40 Watt panels can also be used, and may be needed for extreme climates, or areas without a full sky view. 60 Watt panels have also been known to work, but this is now reaching the the limit of what the loggers can reasonably handle for extended periods and are not recommended for long term deploys.
26 26  
... ... @@ -303,6 +303,7 @@
303 303  
304 304  
305 305  
306 +
306 306  (% class="box" %)
307 307  (((
308 308  = TerraSAWR Specs =
... ... @@ -370,5 +370,6 @@
370 370  
371 371  
372 372  
374 +
373 373  
374 374  )))